37
1
2
3
2.10
Personal protection devices (PPE)
To operate the machine in complete safety is necessary to use appropriate personal protection
equipment, which must be worn before climbing on the basket and used as indicated.
-
Retaining system
-
Safety helmet
-
Safety shoes
-
Protection Gloves
RETAINING SYSTEM
Before climbing in the basket, it is compulsory wearing suitable fall protection systems, which must
be such to completely prevent the fall from a height.
UNI EN 361, with front or rear coupling equipped with retaining or adjustable lanyard (2) for EN 358
which allows to prevent the fall, hooked to the pre-arranged hooking point in the basket, by means of
connectors (3) EN 362 having the suitable shape and dimensions.
Once climbed inside the basket, clip on the connector to one of the coupling points placed on the
floor in the front area of the platform and indicated by the related symbol. Then adjust the lanyard as
short as possible, so as to retain the operator inside the basket.
Summary of Contents for BiBi 850 HE
Page 6: ...5 Chapter 1 General information...
Page 10: ...9 1 6 Performances H I A B L F E C G...
Page 19: ...18 Chapter 2 Safety information...
Page 24: ...23...
Page 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Page 40: ...39 Chapter 3 Machine Description...
Page 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Page 42: ...41 View from A 20 22 21 23 24...
Page 43: ...42 12 8 25 16...
Page 44: ...43 17 2 26...
Page 45: ...44 3...
Page 56: ...55...
Page 59: ...58 Chapter 4 Instructions for use...
Page 68: ...67...
Page 69: ...68 For more information refer to Engine Use maintenance manual...
Page 71: ...70...
Page 72: ...71 For more information refer to Engine Use maintenance manual...
Page 91: ...90 Chapter 5 Emergency procedures...
Page 94: ...93 Chapter 6 Maintenance...
Page 105: ...104 Electrical panel casing Battery 1...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 133: ...132...
Page 136: ...135 HATZ ENGINE...
Page 137: ...136...
Page 138: ...137...
Page 139: ...138 Chapter 7 Demolition...
Page 141: ...140 APPENDICES...
Page 142: ...141 Appendix 1 Declaration of conformity...
Page 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...