PAGE
95
ALMAC s.r.l.
If the inclination of the platform remains within ± 0.5° both laterally and
longitudinally, it is possible to lift the work platform.
Warning: manual levelling is less accurate than automatic levelling
4.2.5.3
Dynamic Levelling during travel
Note: dynamic levelling can be activated only with the platform completely
lowered.
Thanks to this system, the platform, while it is moving, will always remain
levelled and once the operating area has been reached, the machine will already
be in the condition to be lifted.
To activate this mode, it is necessary to turn selector 9 of the push-button panel
to the HARE position and selector 8 to the "DRIVE MODALITY" or ED-S position.
Warning: If selector 8 is positioned on DC-S, the function is not active.
4.2.5.4
Proactive Levelling
Note: the Proactive Levelling is active only up to the maximum travel height
allowed, which on this model is 4.5 mt platform floor (6.5 mt work).
This system allows to correct the levelling of the machine when it is at a height,
if after travelling on not perfectly flat ground, the platform is no longer aligned
with the ground itself.
Since the machine can also be levelled with the platform not in the transport
position, another safety ring, both electric and hydraulic, has been added.
The levelling speeds are significantly reduced compared to those with the
machine in the transport position.
This is wanted both to make the manoeuvre comfortable for the operators and
to minimise the effects due to inertia.
This additional system is not required by standard UNI EN 280:2015
Summary of Contents for Athena 870-BL EVO
Page 6: ...PAGE 6 ALMAC s r l X3 D D E...
Page 21: ...PAGE 21 ALMAC s r l...
Page 46: ...PAGE 46 ALMAC s r l 37 Bi levelling chassis...
Page 118: ...PAGE 118 ALMAC s r l In this configuration the oil level must be as shown in the figure below...
Page 119: ...PAGE 119 ALMAC s r l A 60mm...
Page 141: ...PAGE 141 ALMAC s r l...
Page 142: ...PAGE 142 ALMAC s r l...
Page 143: ...PAGE 143 ALMAC s r l...
Page 144: ...PAGE 144 ALMAC s r l...
Page 145: ...PAGE 145 ALMAC s r l...
Page 146: ...PAGE 146 ALMAC s r l...
Page 147: ...PAGE 147 ALMAC s r l...
Page 148: ...PAGE 148 ALMAC s r l...
Page 149: ...PAGE 149 ALMAC s r l...
Page 156: ...PAGE 156 ALMAC s r l...
Page 159: ...PAGE 159 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 161: ...PAGE 161 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 175: ...PAGE 175 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...
Page 180: ...PAGE 180 ALMAC s r l...