PAGE
82
ALMAC s.r.l.
8
•
Should it be required to
transport the machine, it is
necessary
to
close
the
expandable part up to the "T"
lock.
Unlocking the railing fastenings
To unlock the railing fastenings, it is necessary to:
1)
Turn the safety catch (
A
) of the locking pin (
B
) and then pull it from its seat
2)
Remove the safety screw (
C
)
3)
Once you have extracted all fastenings of the railings, is possible to fold it
according to the instructions in the previous pages
Summary of Contents for Athena 870-BL EVO
Page 6: ...PAGE 6 ALMAC s r l X3 D D E...
Page 21: ...PAGE 21 ALMAC s r l...
Page 46: ...PAGE 46 ALMAC s r l 37 Bi levelling chassis...
Page 118: ...PAGE 118 ALMAC s r l In this configuration the oil level must be as shown in the figure below...
Page 119: ...PAGE 119 ALMAC s r l A 60mm...
Page 141: ...PAGE 141 ALMAC s r l...
Page 142: ...PAGE 142 ALMAC s r l...
Page 143: ...PAGE 143 ALMAC s r l...
Page 144: ...PAGE 144 ALMAC s r l...
Page 145: ...PAGE 145 ALMAC s r l...
Page 146: ...PAGE 146 ALMAC s r l...
Page 147: ...PAGE 147 ALMAC s r l...
Page 148: ...PAGE 148 ALMAC s r l...
Page 149: ...PAGE 149 ALMAC s r l...
Page 156: ...PAGE 156 ALMAC s r l...
Page 159: ...PAGE 159 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 161: ...PAGE 161 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 175: ...PAGE 175 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...
Page 180: ...PAGE 180 ALMAC s r l...