2.1
Notification of commissioning and routine inspections
The work equipment indicated in Annex VII to Legislative decree D.Lgs 81/2008
and successive amendments must be subjected to REGISTRATION and ROUTINE
INSPECTIONS by the competent authorities, i.e. INAIL, the National Institute for
Insurance Against Industrial Accidents (former ISPESL, Higher Institute for
Prevention in the Workplace), the Local Health Authority and other public and
private bodies established by the criteria laid down in Ministerial decree DM
11/04/2011.
•
The User or Employer must notify Commissioning to the territorially
competent National Institute for Insurance Against Industrial Accidents
(INAIL) for the purpose of registering the platform.
•
Once the platform has been registered, ROUTINE INSPECTIONS must begin.
The FIRST of these is performed by INAIL within 45 days (since 21 August
2013) from the date on which the platform is put into service.
•
The successive inspections, to be carried out at the frequency indicated in
Annex VII to Legislative Decree D.Lgs 81/2008, are carried out by the Local
Health Departments (ASL) or, when permitted by the regional laws, by ARPA
(Regional Agency for the Protection of the Environment) or by Public or
Private undertakings, as freely decided by the Employer or User and in
accordance with the established formalities.
Attached are a few EXAMPLES of "notice of commissioning" and "routine
inspections". Users should check them each time in the www.inail.it portal,
according to the installation site in question.
Summary of Contents for Athena 870-BL EVO
Page 6: ...PAGE 6 ALMAC s r l X3 D D E...
Page 21: ...PAGE 21 ALMAC s r l...
Page 46: ...PAGE 46 ALMAC s r l 37 Bi levelling chassis...
Page 118: ...PAGE 118 ALMAC s r l In this configuration the oil level must be as shown in the figure below...
Page 119: ...PAGE 119 ALMAC s r l A 60mm...
Page 141: ...PAGE 141 ALMAC s r l...
Page 142: ...PAGE 142 ALMAC s r l...
Page 143: ...PAGE 143 ALMAC s r l...
Page 144: ...PAGE 144 ALMAC s r l...
Page 145: ...PAGE 145 ALMAC s r l...
Page 146: ...PAGE 146 ALMAC s r l...
Page 147: ...PAGE 147 ALMAC s r l...
Page 148: ...PAGE 148 ALMAC s r l...
Page 149: ...PAGE 149 ALMAC s r l...
Page 156: ...PAGE 156 ALMAC s r l...
Page 159: ...PAGE 159 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 161: ...PAGE 161 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 175: ...PAGE 175 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...
Page 180: ...PAGE 180 ALMAC s r l...