PAGE
72
ALMAC s.r.l.
DANGER
DO NOT TRANSLATE AT HEIGHT
ON WEAK, MUDDY, FROZEN,
SLIPPERY GROUNDS OR CLOSE
TO HOLES, MOATS, DRAINS OR
CRACKS THAT OPEN UP TO
EMPTY SPACES.
EN
Note:
Do not use the MEWP if you are doubtful about the fitness of the ground
surface.
•
After having levelled it, lift the work platform only after making sure,
both visually and by moving inside the work platform, that all 4 ends of
the tracks rest on the ground.
Avoid the following situation for both tracks:
The ring gear of the wheel drive units and the track tensioner wheels
must all be resting on the ground.
If even one of them is not in contact with the ground, the stabiliser area
will be reduced and, consequently, the platform will be unstable and
there will be the risk of overturning.
Summary of Contents for Athena 870-BL EVO
Page 6: ...PAGE 6 ALMAC s r l X3 D D E...
Page 21: ...PAGE 21 ALMAC s r l...
Page 46: ...PAGE 46 ALMAC s r l 37 Bi levelling chassis...
Page 118: ...PAGE 118 ALMAC s r l In this configuration the oil level must be as shown in the figure below...
Page 119: ...PAGE 119 ALMAC s r l A 60mm...
Page 141: ...PAGE 141 ALMAC s r l...
Page 142: ...PAGE 142 ALMAC s r l...
Page 143: ...PAGE 143 ALMAC s r l...
Page 144: ...PAGE 144 ALMAC s r l...
Page 145: ...PAGE 145 ALMAC s r l...
Page 146: ...PAGE 146 ALMAC s r l...
Page 147: ...PAGE 147 ALMAC s r l...
Page 148: ...PAGE 148 ALMAC s r l...
Page 149: ...PAGE 149 ALMAC s r l...
Page 156: ...PAGE 156 ALMAC s r l...
Page 159: ...PAGE 159 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 161: ...PAGE 161 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 175: ...PAGE 175 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...
Page 180: ...PAGE 180 ALMAC s r l...