![AlluGuard AG55 Operating, Maintenance, Servicing And Installation Manual Download Page 26](http://html1.mh-extra.com/html/alluguard/ag55/ag55_operating-maintenance-servicing-and-installation-manual_2904201026.webp)
26
27
EC DECLARATION OF CONFORMITY - CUSTOMER COPY
THE SUPPLY OF MACHINERY (SAFETY) REGULATIONS 1992
The above power operated door (door, operator, safety devices, etc.), has been assembled, installed,
connected and tested in accordance with the manufacturer’s instructions, at the following site address and
is in conformity with the provisions of the Machinery Directive (89/392/EEC as amended by 91/368/EEC and
93/336/EEC), the Low Voltage Directive (73/23/EEC) and EMC Directive (89/336/EEC).
The Transposed Harmonised Standards used in the design of the above door are as follows: EN 13241-1:2003, &
12453:2001.
Model:
Signature:
Signature:
Date:
Date:
Size (W x H):
Installed By:
Site Address:
Declaration (made by installation engineer):
Declaration and instructions received by:
Serial Number:
Print name:
Print name:
Tel:
Tel:
Summary of Contents for AG55
Page 11: ...11 ...
Page 23: ...23 EMR Exterior Release Kit Installation Instructions ...