SZD-54-2
„Perkoz”
TECHNICAL SERVICE MANUAL
SECTION 16.
PERIODIC MAINTENANCE
Issue II
April 2014
Revision No. 2
May 2017
Allstar PZL Glider Sp. z o.o.
Doc No. 542.4.02
page 16.1
corrected
SECTION 16.
PERIODIC MAINTENANCE
16.1. General rules for periodic maintenance
When performing maintenance work, the information and recommendations
contained in this Technical Service Manual should be observed.
The periodic overhauls can be accomplished by persons appropriately
approved and experienced in this area
– in agreement with airworthiness Authority.
Sailplane overhaul after hard landing or after other exceedance of operation
limits is to be made as in periodic maintenance.
Sailplane main overhaul is to be done by appropriately approved (Part 145,
Part M/F etc.) maintenance organization.
At every sailplane rigging the mating parts should be lubricated
– see Section
5. Lubrication instruction.
Completed maintenance work must be certified in accordance with applicable
requirements and using the current forms required in maintenance organization.
Specification of completed maintenance work, in accordance with table contained in
item 16.10., should have a form of sailplane verification record.
Records of sailplane weighing, made in accordance with instruction given in
Section 7. and 9., must be enclosed to sailplane documents. Record samples in
Section 18.
16.2. Periodic maintenance of SP3 stall warning device
Periodic maintenance work scheduled for every 100 flying hours or every 12
months, and these after 1000 flying hours are to be made in accordance with Service
Manual for SP3 stall warning device, if it is installed in the glider.
2