All
SportSystems, Inc.
©
2021
BLACKOUT™ PANEL INSTALLATION
Step 13 - Install BlackOut Panels
You will receive six (6) panels for dressing out your SuperBay™. Customers with the SkyRailPLUS will
have a notched Center Panel.
Install panels in the number
order shown.
Panels are installed on the outside
of the cage over the netting. To
attach a panel to your cage, wrap
the velcro edge around the front
pole, attaching to the velcro strip on
the inside of the panel. Next zip tie
the panel to the rear pole through
its grommets. Be sure not to over
tighten the zip ties.
STEPS 1 & 2: Install Side Panels
Attach via velcro strips and
grommets with zip ties.
STEP 3: Install Center Panel
Attach via velcro strips and
grommets with zip ties. Customers
with the SkyRailPLUS will receive a
notched Center Panel which
dresses the front of their cage
around the SkyRailPLUS..
STEPS 4 & 5: Install Corner
Panels
Attach via velcro strips and
grommets with zip ties. Corner
Panels will velcro to Center Panel
and Side Panels front edges.
STEP 6: Install the Rear Panel
Attach to the rear top pole using
cable ties. The sides will attach to
velcro strips on the left and right
side of your corner and side
panels.
Page 24 of 39
Last Revised 8/5/21