Step 4 - Install BlackOut™ Pole Sleeves

In the rare case that the BlackOut Wrapper Kit does not ship with the rest of the bay continue with the rest of the
installation.  You have the option of using your system until the BlackOut™ kit arrives.

Install pipe sleeves on each of the four depth poles. Pipe sleeves wrap around the pole and then
velcro closed.

Page 14 of 39

Return to Table of Contents

Last Revised 8/5/21

Summary of Contents for SUPERBAY 10W

Page 1: ...SportSystems Inc 2021 sales allsportsystems com 877 847 1280 www allsportsystems com SETUP GUIDE FOR THE SUPERBAY Golf Simulator Screen Systems Page 1 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 2: ...AllSportSystems Inc 2021 Page 2 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 3: ...EMS 6 BUILDING THE FRAME 8 INSTALL NETTING 15 PROJECTION SCREEN INSTALLATION 18 BLACKOUT PANEL INSTALLATION 24 SAFETY PRECAUTIONS 25 APPENDIX A SideRite and ShotDefender Cable Assembly 26 APPENDIX B BUILDING THE FRAME For Low Ceilings 29 APPENDIX C EMT POLE SCHEMATIC 38 Page 3 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 4: ... on the following page Trade Size Designation 1 diameter common EMT 10 ft Conduit Actual Size Outside diameter is approximately 1 3 16 see Appendix C Steel Channel Strut commonly called Unistrut or SuperStrut Only needed for customers with SkyBridge Brackets or the SkyRailPlus cage attached projector mount 1 5 8 x 7 8 or 1 5 8 x 13 16 also known as shallow channel strut are recommended These 10 lo...

Page 5: ...o 8 9 ea Width 4 poles at 10 0 no cuts needed Width Extender 2 poles cut into 4 pieces 3 9 long Depth 2 poles cut into 4 pieces 4 9 long SuperBay 16W x 9H x 5D 14 poles Height 4 poles cut to 8 9 ea Width 4 poles at 10 0 no cuts needed Width Extender 4 poles cut to 5 9 ea Depth 2 poles cut into 4 poles 4 9 ea Poles for custom sized bay If you have ordered a custom dimension bay use the information ...

Page 6: ...eceive T Connectors as SkyBridge span brackets replace T Connectors in your enclosure OTHER ITEMS ITEM QTY DESCRIPTION ITEM QTY DESCRIPTION Cable zip ties Multiple pieces BlackOut Wrapper Kit 1 ea Interior Netting 1 ea Baffle Net single netting square 3 ea Stainless Steel Cables Turnbuckles 1 ea for ShotDefender 2 ea for SideRite See Appendix A 1 ea Impact Screen Page 6 of 39 Return to Table of Co...

Page 7: ...Brackets for strengthened screen pole channel purchased separately see respective user guide for specific instructions for installation SkyRailPLUS Sliding Golf Simulator Projector Mount installs in your Golf Cage see respective user guides for specific instructions for installation Page 7 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 8: ...s Note that the 10 Wide SuperBay does not use couplers Couplers are used to extend the length of the width poles beyond 10 feet wide This example shows a cage 12 feet wide Note Corner brackets add approximately 3 to the size of your enclosure Therefore once poles and brackets are assembled an additional 3 will be added to the finished width height and depth of your enclosure Therefore all poles ar...

Page 9: ...his example shows a cage 12 feet wide Note Corner brackets add approximately 3 to the size of your enclosure Therefore once poles and brackets are assembled an additional 3 will be added to the finished width height and depth of your enclosure Therefore all poles and strut channel are cut 3 shorter than the finished height width or depth of the enclosure If you have ordered a custom sized enclosur...

Page 10: ...ach around the L Corner connectors Ensure the open channels of the strut are facing each other Note Corner brackets add approximately 3 to the size of your enclosure Therefore once poles and brackets are assembled an additional 3 will be added to the finished width height and depth of your enclosure Therefore all poles and strut channel are cut 3 shorter than the finished height width or depth of ...

Page 11: ...f the rear height poles Insert top rear width pole to complete the back of the frame Insert two upper depth poles into the rear top 3 ways Slide two T Connectors on each of the upper depth poles For SkyRailPLUS SkyBridge T Connectors are not used Add two L Corners to the bottom depth poles Insert two front height poles into the L Corners Add two 3 Ways to the front height poles For SkyRailPLUS add...

Page 12: ...re and the impact screen Tighten the T Connectors SkyRailPlus Customers As noted in the setup guide for the SkyRailPlus the spacing between the front unistrut and screen unistrut should be exactly 4 feet Improper spacing can cause the SkyRailPLUS to fall from the cage during installation Be sure to take precautions when mounting in place Page 12 of 39 Return to Table of Contents Last Revised 8 5 2...

Page 13: ...closure Before proceeding reverify that all connectors are tight and outside dimensions are correct Shown below is a 12 Wide SuperBay 5 deep Interior width should be about 2 5 minus your cage width Shown here SuperBay 12Wx9Hx5D Screen Pole 4 ft from front Frame Bottom IF YOU HAVE PURCHASED SKYGUARD NETTING OR THE SKYRAILPLUS IT SHOULD NOW BE MOUNTED ON THE CAGE PRIOR TO THE INSTALLATION OF ANY NET...

Page 14: ...t ship with the rest of the bay continue with the rest of the installation You have the option of using your system until the BlackOut kit arrives Install pipe sleeves on each of the four depth poles Pipe sleeves wrap around the pole and then velcro closed Page 14 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 15: ...e Attach Netting to Corners Using provided cable ties attach the netting to the rear top corners first Then use cable ties to attach the netting to the top front corners Next attach netting to the bottom rear and front corners Finally attach netting to each vertical height pole and horizontal width poles The netting should be tightly stretched around the exterior of the enclosure Tight netting wil...

Page 16: ...y be 8 to 10 feet deep If the netting is deeper than the depth of your enclosure the extra netting can be handled in one of two ways as follows 1 Take any extra netting that proceeds past the front of the enclosure and wrap it into the inside of the enclosure and pull it back toward the rear of the enclosure Once you ve stretched it back as far as it will go hold it in place with cable ties 2 The ...

Page 17: ...from the Screen pole which should be located about 12 from the back of the enclosure Connect the sides of the baffle net to the outside netting with cable ties in several places along each side Netting Completed Page 17 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 18: ...e cables on the enclosure 1 Wrap the SideRite cabling around the top and bottom depth poles 2 Cable should be directly in front of the screen pole 3 Open both ends of the turnbuckle as far as possible without coming apart Attach the hook end of the turnbuckle to the other end of the cable Be sure the top and bottom of your Side Rite cabling is as vertically straight as possible before tightening 4...

Page 19: ...AllSportSystems Inc 2021 Enclosure showing SideRite Cables netting and Blackout Sleeves Page 19 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 20: ...impacts Your screen can be placed in the washing machine use MILD detergent on a gentle cycle DO NOT USE BLEACH OR PLACE SCREEN IN DRYER IDENTIFY THE FRONT SIDE of your screen The AllSportSystems logo will be sewn into the bottom left face of your screen The smooth face of the grommets will always be on the front side of your screen DO NOT INSTALL THE SCREEN BACKWARDS IT WILL SIGNIFICANTLY REDUCE ...

Page 21: ...hang the screen with the AllSportSystems logo or smooth side of grommets facing toward the front of the enclosure Using cable ties loosely attach the screen to the Screen Pole IMPORTANT To avoid screen sag and wrinkles allow the screen to hang below the screen pole and even with the floor Page 21 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 22: ...ets and around both of the SideRite cables Tip Do not tighten the zip ties until they have been installed on both sides of the screen After both sides are loosely tied to their SideRite cables gradually tighten the ties on the left and right sides creating even tension that centers the screen in the enclosure Page 22 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 23: ...ollow the steps below to install the cable on the enclosure 1 Wrap the ShotDefender cable around the upper depth poles about 6 in front of the screen 2 Loosen the turnbuckle bolts as far as possible Attach the hook end of the turnbuckle to the open end of the cable 3 Tighten the cable by twisting the turnbuckle creating tension on the cable 4 Attach the black ShotDefender sleeve to the cable by cl...

Page 24: ...ure not to over tighten the zip ties STEPS 1 2 Install Side Panels Attach via velcro strips and grommets with zip ties STEP 3 Install Center Panel Attach via velcro strips and grommets with zip ties Customers with the SkyRailPLUS will receive a notched Center Panel which dresses the front of their cage around the SkyRailPLUS STEPS 4 5 Install Corner Panels Attach via velcro strips and grommets wit...

Page 25: ... trim Velcro will attach to the exposed velcro along the front edge of your side panels Add weights to the two included sandbags Use zip ties to attach the weighted sandbags to the ends of the Angled Side Netting Pull the netting out and adjust to your desired angle Page 25 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 26: ... to sit directly against a wall We recommend the sides of the enclosure be no closer than 12 away from walls or other objects Your screen is fully capable of handling real golf balls However for added safety consider using Almost Golf Balls or foam balls rather than real golf balls when hitting indoors Enjoy and be safe AllSportSystems Page 26 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 27: ...rst be assembled SideRite Tension Kit Requires two cables two turnbuckles and 8 wire clips ShotDefender Requires one cable one turnbuckle and 4 wire clips What s Included Cables 4 ea Wire Clips per cable 1 ea turnbuckle per cable Tools Equipment needed wrench gloves wire cutters Safety Use gloves when handling the cabling Page 27 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 28: ...pe 2 Cut the cable at the tape so that cable end is properly seized and will not unravel 3 Place two wire clips on cable 4 Thread cable end through the eye fitting of Turnbuckle 5 Thread end of the cable back through wire clips 6 Close loop and tighten wire clips with wrench so that cable does not slip Leave about 1 of cable beyond last wire clip Page 28 of 39 Return to Table of Contents Last Revi...

Page 29: ...oles for each SideRite Cables Pull the end of the cable through the hooked end of the turnbuckle until cable is tight Mark the cable to indicate where the eye should be formed 2b Determine Proper Cable Length for ShotDefender Cables wrap cable around the top left and top right depth poles across the entire width Pull the end of the cable through the hooked end of the turnbuckle until the cable is ...

Page 30: ...ssembly Refer to this diagram to identify connectors and poles needed for the step by step instructions on the following pages TIP Position connectors so that the Eye Bolts face DOWN and toward the INSIDE of the enclosure 2 ea L Corners 2 ea T Connectors 6 ea 3 Way Corners 4 ea Couplers SuperBay greater than 10 wide Poles purchased separately from local hardware stores Page 30 of 39 Return to Tabl...

Page 31: ...on the ground near your back wall This will become your top rear width pole Add two 3 Way Corners on each end Verify Dimensions Use a tape measure to verify correct width dimension and then tighten all connectors You may need to back the poles slightly out of the connectors to reach the correct dimension Page 31 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 32: ...ight Poles Leaving the pole on the ground connect two Height poles to the 3 Way Corners Add two more 3 Way Corners to the other end of the Height Poles but do not fully tighten these Page 32 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 33: ...cture into place Once it is in place you can then spin them into their proper orientation so as to install the bottom Width Pole With an assistant carefully stand the structure up and lean it against the back wall of your room The assistant should hold frame in place securely against the wall Page 33 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 34: ...ions Use a tape measure to verify correct width dimension and then tighten connectors You may need to back the poles slightly out of the connectors to reach the correct dimension Continue to have an assistant steady the frame against the wall Page 34 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 35: ...021 Step 5 Add Bottom Depth Poles Insert two Depth poles into the Bottom Rear 3 Way Corners and tighten these connectors The structure will now stand on its own Page 35 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 36: ... Connectors are not needed Insert WIDTH pole into T Connectors This will create the Screen pole where your screen will hang Temporarily slide the Screen Pole back toward the rear of the enclosure as far as possible this will make installing the last width pole on the front of the enclosure easier For SkyRailPlus SkyBridge configurations see SkyBridge setup guide for instructions on installing this...

Page 37: ...Corners on the other end and connect the Height poles to the structure as shown with the three way on top and L Corners on the bottom For SkyRailPlus configurations add L Corners to both ends of front height poles and connect to the lower and upper depth poles Page 37 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 38: ...structions on installing this pole at the front of the cage Verify Dimensions Use a tape measure to verify the correct depth dimension and then tighten connectors You may need to back the poles slightly out of the connectors to reach the correct dimension This completes the special instructions for tight ceilings Page 38 of 39 Return to Table of Contents Last Revised 8 5 21 ...

Page 39: ...AllSportSystems Inc 2021 APPENDIX C EMT POLE SCHEMATIC Page 39 of 39 Return to Table of Contents Last Revised 8 5 21 ...