
Allied Construction Products, LLC www.alliedcp.com
SOM576701_14jan
viii
Table of Contents
SECTION
Pg.
Revision History of Document…………………..…
i
Safety Information…………………………………….
ii
Safety Statements and Hazard Alerts……………….
ii
Purpose of Safety Messages……………………..….
ii
Safety Alert Symbol...…………..……………….…….
ii
Signal Words – Type and Application………....……. ii
Safety, Information & Identification Labels……..….
iii
Meaning of Pictograms ..……………………..……….
v
Attention Read the Manual……………………….....
vi
Qualified Person…………….………………...………
vi
Safety Information Overview…………………………
vi
General Construction Safety…………………………
vi
Federal, State, Local and OSHA Construction
Guidelines and Regulations……………….……..
vi
Owner’s Responsibilities………………………….……
vi
Operational Safety Program………………….….….
vi
Personal Protective Equipment (PPE)……………….
vii
Protective Equipment – Guarding……………………
vii
Unapproved Modifications……………………………..
vii
Table of Contents………….…………………..……...
viii
List of Figures………………………....………………
x
1.0 Introduction & Scope………………………….…
1
1.1 Purpose of This Manual………………..….………
1
1.2 Content Includes………..………………….……....
1
1.3 How to Order Replacement Publications….…….
1
1.4 Related Publications….………………..…….…....
1
2.0 Equipment Identification………….……..……...
3
2.1 Serial Number Location.………………….…..….
3
2.2 Equipment Identification Tag………………..…..
3
2.3 Record Equipment Information.………………...
3
3.0 Warranty Protection Summary………..………
4
3.1 Overview…….……………………………….……..
4
3.2 Owner’s Responsibilities………….….……...…...
4
3.3 Allied Product Policies……………….…………...
5
SECTION
Pg.
4.0 Product Information……………………………...
6
4.1 Description and Typical Applications……………..
6
4.2 Familiarization of Breaker Components…….…...
6
4.3 Principle of Operation………………………..……. 6
5.0 Sizing the Breaker…………………..…....………
8
5.1 Selecting the Proper Size Breaker……………….
8
5.2 Auxiliary Circuit & Conversion Kits……………….
8
6.0 Operation……………………..…………...………
10
6.1 Before the Breaker is Used………………..……..
10
6.1.1 Pre-Operation Inspection………………..……. 10
6.2 Operating the Breaker………………….………... 10
6.3 Incorrect Operating Methods..…………………….
11
6.3.1 Note Any Change in Pitch / Frequency…….…
11
6.3.2 Do Not Lift or Transport Loads with Breaker…
12
6.3.3 Do Not Drop / Pound Breaker at the Material..
12
6.3.4 Do Not Pry with Breaker…………………………
12
6.3.5 Do Not Operate With Cylinders At Stroke End..
13
6.4 Special Applications / Operating Conditions……. 13
6.4.1 Working Underwater………………….……….. 13
6.4.2 Working Underground……………………..……
13
6.4.3 Working in Hot Temperatures……………..…..
13
6.4.4 Working in Cold Temperatures………………...
13
7.0 Care and Maintenance…………………………...
15
7.1 Maintenance Interval Schedule…………………...
15
7.2 Keeping a Maintenance Log……………………..
16
7.3 Housing Box Inspection…………………………..
16
7.3.1 Vibration Dampening Components……...…….
16
7.4 Front Head Inspection At Tool Re-lubrication
16
7.4.1 Measure Gap Between Tool and Bushing……
16
7.4.2 Internal Parts of the Front Head..……………..
17
7.4.3 Inspection of Front Head's Internal Parts……..
18
7.4.4 Measure Wear of Tool & Bushings…..………..
18
7.4.5 Inspect Tool Retainers….………..…………….. 19
Summary of Contents for AR110C
Page 60: ...SOM576701_14jan R ...