![Allen Engineering Corporation RAZORBACK 12HD Operation Manual Download Page 18](http://html1.mh-extra.com/html/allen-engineering-corporation/razorback-12hd/razorback-12hd_operation-manual_2899367018.webp)
• STRING LINING •
OPERATIONS
SECTION 1
To string line your screed, there
are a few important steps that
need to be followed.
•
Place screed ends on a 2 x 6
or other wooden type support.
•
At approximately 1” out from
the leading edge of the screed
blade, drive a nail into the
wooden support. NOTE: Nail
should be on the outside of the
wooden support.
•
Stretch a line as tight as
possible from nail to nail.
Make sure that the nail is
contacting each support at the
point of blade contact.
•
NOTE: The supports do not
have to be on the same level.
•
Use a short, flat piece of metal
or wood as a gauge block to
compare the string to the
bottom surface of the screed
blade and bullfloat blade.
•
The blades should be equal to
each other at each splice. If
they are not even, loosen jam
nuts and tighten top pipe
coupler as described on page
S1-12.
NOTE: Always string line your
S1-15