Assembly and Installation
Chapter 3
324
When a pair of I/O Modules (a Module group) is seated, the Module Locking
Latch at the the top of the I/O Chassis is snapped down to secure the I/O
Module (Figure 3.15). The Field Wiring Arm is then pivoted up and snapped
onto the wiring arm locking tab.
Figure 3.23
Installing Processor Module
4 slot I/O
Processor Module
inserted here
Module Locking Latch
10841I
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com