%%# ,
A–5
*' $#)'$!!' "#( $#(
Use the drilling template at the back of the manual for mounting the controller.
$#)'$!!'( ) #! (
%% "&!*
%% "&!*
%% "&!*
" !+ $*
À
+'!!
"#( $#(
$#)'$!!'( ) (
%% "&!*
%% "&!*
%% "&!*
" !+ $*
$#)'$!!'( ) (
%% "&!*
%% "&!*
%% "&!*
" !+ $*
+'!!
"#( $#(
+'!!
"#( $#(
À
*' $*#) # &* '"#)(
' ( $+'
$*#) #
D
There must be a minimum of 12.5mm
(0.5 inches) clearance around all sides of the
controller. Use either DIN rail or mounting
holes. (Use the drilling template at the back
of the manual for mounting the controller.)
"& &$ !"#&**
',&+"& * )-*
',&+"& ')(,
(' %) $#
"&
$ "&
#! (
%%
% .
+' %
)'
D
See Figure A.1 for details on controller
dimensions and weights.
D
Leave debris cover attached during
controller installation to protect from
falling debris. To ensure proper controller
operation, remove cover before applying
power.
Summary of Contents for 160 SSC
Page 9: ...ii This Page Intentionally Blank...
Page 11: ...ii This Page Intentionally Blank...
Page 23: ...2 10...
Page 33: ...5 6 Program Group P Parameter Description 41 0 4 2 42 43 2 1 44 1 1 3 3 45 0 1 3 3 2 0 1...
Page 41: ...6 2...
Page 54: ...Index I 1 4 1 4 1 1 0 3 1 3 3 1 1 1 1 0 0 3 3 3 0 4 3 1 3 1 2 3 1 3 1 3 0...
Page 55: ...Index I 2 0 0 0 0 0 0 0 0 0...
Page 57: ......
Page 58: ......