![Alia AMC2100 Series Operation Manual Download Page 7](http://html1.mh-extra.com/html/alia/amc2100-series/amc2100-series_operation-manual_2896251007.webp)
6
d. Electrode position should parallel with ground
EM Flowmeter installed by horizontal or slanting the electrode position(A.B) should match the 2 side( right/left)of
tube, converter(wiring box)should be top of the tube.
e. Transportation
When you moving, please remember DO NOT use rope through the flowmeter tube, it may cause Liner inside
broken.
Please DO NOT use your hand or rope to hang on Converter or wiring box, if Flowmeter size is bigger than
80mm, because the material of converter and wiring box is tender aluminum, it can’t stand huge weight.
f. Grounding measure
Horizontal install, the electrode position A.B should on the right and left side.
General metal tube
Non-metal tube (plastic tube Liner)
>
300mm
Exhaust valve
Grounding Ring
Grounding resistance
<
10
Grounding resistance
<
10
Summary of Contents for AMC2100 Series
Page 1: ...ALIA TECHNOLOGY LLC...