![alfaplam GRANDE Instruction For Use & Installation Instructions Download Page 4](http://html.mh-extra.com/html/alfaplam/grande/grande_instruction-for-use-and-installation-instructions_2895602004.webp)
4
Figure 1. Handling the boiler by supports
Remove all packaging material away from children's access. There is a risk of suffocation with bags,
foils, polystyrene, etc.
2.4 RESPONSIBILITY OF THE INSTALLER
The responsibility
of the installer is to carry out control of all pipes and pipelines, air supply and all necessary
solutions as required for the proper installation of a pellet boiler.
The responsibility
of the installer is to bring into accordance the service with the local laws applicable at place of
installation.
Standard UN 10683 defines the responsibilities of the installer
. The installer must
check
:
-
type of device to be installed
-
adequacy of space for installation of the unit, which means the minimum requirement for the size of space
where the boiler will be installed
-
the manufacturer's instructions with respect to the device related to the flue gases
-
the interior of the chimney, the material from which it is made, whether it is flat, i.e. free form obstacles
-
height and vertical extension of the chimney
-
the existence and well-executed chimney cap
-
possibility of supply of outside air
-
possibility of simultaneous use of installing generating set and other equipment
If the results of all the above indicated and approved requirements are positive, the installation may begin.
Please, follow carefully the instructions given by the manufacturer, and the relevant safety and fire standards.
When the installation is complete it is necessary to carry out the test for at least thirty minutes to check all
specified requirements.
When the installation is complete, the installer must provide the buyer with the following:
-
Instructions for use, maintenance and installation of the manufacturer (if it is not already part of the unit)
-
The required documentation in accordance with applicable standards
3.0 INSTALLATION
The responsibility for the operation of installing rests solely with the installer and the customer.
Before beginning the installation, the installer must check all the statutory safety standards and specially:
-
check that the norms regarding the installation of pellet boilers meet local, national and European
standards
-
recognize the requirements of this document
-
check that the pipes and the air supply line are in accordance with the type of installation
-
not make temporary electrical connections and thereby use exposed electrical cables
-
check the grounding of electrical system
-
always use individual safety equipment and legal requirements of protection
-
always leave enough space for maintenance and servicing of the boiler
3.1 INSTALLATION
OF A PELLET BOILER
It is recommended to unpack the pellet boiler when it is at the place where it will be installed.
Thread