It  is  preferable  to install an R1" multistage pump with a flow rate capacity that always meets current 
system  needs.  Install  block  valves  immediately  downstream  and  upstream  of  the  pump  to  enable 
removal of pump for repairs, replacement etc. without discharging the water from the system. 

-

 

Install the spigot used for filling and discharging the system on the return pump at the lowest point of 
the system. 

-

 

Prior to startup, fill the system with water as follows: 

a)

 

for open circuits, fill the system using the spigot for filling and discharge, until the water starts to 
leak from the expansion vessel’s overflow pipe, 

b)

 

for closed circuits, system pressure (operating pressure) should be 0.1 

÷

 0.15 mPa (1 

÷

 1.5 bar). 

 

In  both  cases,  slowly  fill  the  system  so  that  air  can  escape  through  air  release  valves.  If  the  valves  are  not 
opened automatically, open them manually until water starts to leak, and then close them. 

-

 

Do not discharge water from the heating system even during summer, because it protects the inside of 
the system from oxidation (corrosion). 

-

 

If you will not use the boiler for a longer period during winter and no antifreeze mixture is pored into 
the system, it is best if you discharge water from the system. While discharging the system, open the 
radiator valves, air release valves and other system blocking elements. 

-

 

You may not light a fire if water in the boiler is frozen or if there is not enough water in the boiler. 

 
 

8. STARTUP AND LIGHTING THE FIRE 

Before you light the fire for the first time, the entire local (central) heating system should be filled with water 
and well bled, and the stove should be properly connected to the chimney, as described in the foregoing items. 

NOTE: The stove may not be used without water. It must be connected to the system, which is connected 
to consumers (radiators) with the power of no less than 14 KW. 

When  the  system  is  cold,  power  regulator  (combustion  regulator,  thermostat)  damper  located  on  the  ash  pan 
door (Fig. 1, Items 10 and 19) should be open. Pull out the damper open and close knob (Fig. 1, Item 4 and Fig. 
15). This opens the damper and enables you to light the fire. Later, when the fire has been burning for a while, 
set  the  damper  to  an  appropriate  position,  depending  on  the  chimney  draw  and  desired  power,  and  push  the 
knob  back.  This  closes  the  damper  and  enables  maximum  yield  of  combustion  and  thereby  better  heating, 
cooking and baking. During this process, fire box and ash pan door (Fig. 1, Items 7 and 9) must be closed, if 
you need controlled burning. Fire lighting damper is opened only while the fire is being lit (10 to 15 minutes). 
Fire box and ash pan door may be opened and closed manually or using the wrench shown on Figure 6. 
Fire  is  lit  in  the  stove  the  same  way  as  in  other  solid  fuel  stoves.  Fire  is  lit  with  the  ash  pan  door  and  grate 
holder  open  (Fig.  9  and  Fig.  10).  Grate  holder  (Fig.  1,  Item  13  and  Fig.  9)  is  opened  by  lifting  and  pulling. 
When the fire starts burning, you may load wood or coal, but do not fill the firebox at once and divide the fuel 
necessary to fill the firebox in two or three portions and load them into the firebox in 10 

÷

 15 minute intervals. 

A stove loaded in such way can burn for 1 to 6 hours, depending on combustion strength in the stove or on the 
regulator (thermostat) setting. 
 
 

             

            

   

 

 

Figure 9  

 

 

Figure 10 

 

 

Figure 11 

 

Summary of Contents for ALFA TERM-27

Page 1: ...STOVE USED FOR LOCAL HEATING ALFA TERM 27 INSTALLATION SETUP AND OPERATION INSTRUCTIONS...

Page 2: ...IONS Width 315 mm Height min max 264 460 mm Depth 414 mm FIREBOX DOOR OPENING width height 175 200 mm FLOW AND RETURN PIPE CONNECTIONS R1 RS THERMO VALVE AND SAFETY VALVE CONNECTIONS R1 2 RU COOLING P...

Page 3: ...pipe connection 21 Cleaning access plate 22 Handle 23 Grate support 24 Additional lid 25 Lever support 26 Tertiary air regulator knob 27 Tertiary air regulator cover 28 Cleaning access plate smaller...

Page 4: ...4 Figure 1...

Page 5: ...t and not on the side outlet The stove will reach its nominal heating capacity if the draft in the chimney is 20 Pa A chimney ensuring good draft is the basis of proper functioning of the stove The ch...

Page 6: ...walls it must be well insulated If the chimney connection is tightly connected to the chimney if the connection is extended If it is properly cleaned and free of birds nests dirt and soot If the flue...

Page 7: ...ation of the thermo valve safety pipe Item 6 is an R1 2 connection with an inner thread for safety valve installation 6 1 FLOW PIPE AND RETURN PIPE Fig 4 Items 1 and 2 and Fig 7 and 8 Items 3 and 10 T...

Page 8: ...R1 2 connection Fig 4 Item 6 is welded at the back of the boiler under the cooktop frame on which a safety valve MUST be fitted The safety valve should be 2 5 to 3 bars You can fit it directly on the...

Page 9: ...expansion vessel of 25 l and not more than 18 l which should be fitted on the return pipe as close to the boiler as possible and no block valves can be fitted between the boiler and expansion vessel...

Page 10: ...pe connection 3 Distribution pipe 4 Open expansion vessel 5 Safety valve 6 Radiator valve 7 Radiator 8 Air release valve 09 Circulation pump 10 Return pipe 11 Spigot for filling and discharge 12 Safet...

Page 11: ...em should be filled with water and well bled and the stove should be properly connected to the chimney as described in the foregoing items NOTE The stove may not be used without water It must be conne...

Page 12: ...of the grate and pull it out of its holder Place the grate on the supports 4 pcs welded inside the boiler firebox at the front and in the back 2 2 pcs Fig 1 Item 23 Place the grate at an angle slante...

Page 13: ...e damper used for starting the fire must be closed and power regulator must be open After you finish baking cooking or frying place the power regulator in desired position While baking increase the te...

Page 14: ...cloth cleaning agents and mild detergent instead Clean the oven after each use while still hot After cleaning leave the oven door open for a few minutes to prevent bad odors the next time you heat the...

Page 15: ...n all valves in the heating system and enable normal water circulation in the system Circulation pump failure Repair or replace the circulation pump to enable heating system operation Power outage Ope...

Page 16: ...mp speed Replace pump nuts or the entire pump 10 Noise murmur coming from the heating system Pump speed is too high Lower the speed Air in the system Bleed the air from the heating system Loose knobs...

Page 17: ...oor 17 Excessive heat for baking or cooking Thermostat set to a high temperature Reduce water temperature using the thermostat or burn a smaller fire 18 Boiler stove is smoking when used for the first...

Page 18: ...ses if the damage has occurred during transportation after the device was sold if the defects occurred due to improper mounting improper maintenance or mechanical damaging by the buyer if the defect o...

Page 19: ...19 Outline dimensions of ALFA TERM 27 stove Figure 16...

Reviews: