Following the consumption of the entire tank of pellets the combustion chamber must be cleaned by vacuuming and/or 
removing all debris generated by pellet burning.  
Incompletely burned pellets should never be returned to the pellet tank or disposed of in the container for ashes.  

 

 

INSPECTION AND PARTS THAT NEED TO BE MAINTAINED  

CHECK THE ITEMS LISTED BELOW TO ENSURE PROPER OPERATION OF PELLET BOILERS. THESE PRECAUTIONS 
ENSURE THE MAXIMUM OUTPUT OF THE BOILER AND THE TEMPERATURE OF THE SYSTEM: 

     

    Make sure that the pellet boiler and ashes in it are cold. 

 

For a complete cleaning every week or after 200 kg of pellets have been consumed (whichever is earlier) the 
ashes underneath the firebox and from the combustion chamber must be vacuumed. You can use a brush to 
clean the walls of the firebox.  

 
GENERAL CLEANING OF THE BOILER AT THE END OR BEGINNING OF THE HEATING PERIOD: 

 

          Make sure that the boiler and ashes in it are cold. Turn off the power supply to the boiler. 

 

Upon completion of the heating period, disconnect the power supply to the boiler. It is very important to clean 
and inspect the boiler as described in this manual. 

 

The door seal may get detached after some time, although it is attached with glue resistant to high temperature. 
To reattach the seal apply an adhesive resistant to high temperature on the back side of the seal. In this way the 
sealing of the firebox door is guaranteed. 

                    CONNECTION OF THE FLUE PIPE TO THE CHIMNEY (should be cleaned at the end of each heating season). 

   

           Make sure that the pellet boiler and ashes in it are cold. 

                     - The flue pipe, chimney and chimney cap should be inspected and cleaned annually. To carry   out the 
procedure professionally, you should contact the chimney sweep. 

 

 

ADDITIONAL MAINTENANCE 

Your pellet boiler is a source of heat in which only pellet may be used.  Annual maintenance of the boiler can only be 
performed by a person authorized by the Alfa Plam company a.d.  
Regular annual service will preserve proper operation of the heating units, ensure their greater efficiency, keep the 
warranty valid and extend the life of the machine itself.  
It is recommended to carry out the procedures described in the previous section at the end of the heating period. The 
purpose is to verify and ensure proper operation of all components. 

 

8.

 

IMPORTANT SAFETY INFORMATION 

 

You have purchased the highest quality product. 
The supplier is at your service for any information you may need. Proper installation of the boiler, carried out in 
accordance with the attached guidelines, is important for the prevention of any defect, risk or danger of fire.  
The pellet boiler works on the basis of underpressure generated in the combustion chamber, therefore it should always 
be ensured that the joints to the chimney are sealed and tight. 

 

In the event the chimney catches fire, people and animals should immediately leave the residential area. Disconnect the 
power supply to the main switch immediately after that, or cut the plug out of the socket (only if you are not putting 
yourself at risk), and contact the fire department. 
 

 

For safety purposes and preservation of function of the pellet boiler, do not use finely chopped wood. 
 

 

Do not use the pellet boiler for incineration. 

 

9.

 

PELLET QUALITY IS VERY IMPORTANT 

 

The quality of pellets is very important! 
The boiler is designed to use pellets. Considering that a variety of types and sizes of pellets are available on the market, it 
is important to choose pellet that contains no impurity, which is compact and does not generate dust.  

Summary of Contents for GRANDE 37

Page 1: ...1 A D METALNA INDUSTRIJA VRANJE Radni ka br 1 PELLET BOILER GRANDE 37 INSTRUCTIONS FOR USE MAINTENANCE AND INSTALLATION ENG V 1 0_JUN 2018...

Page 2: ...placed above the boiler part of the plant Fuel pellets are filled from above through the lid to be used for that purpose Make sure that the boiler is properly dimensioned with respect to the heating s...

Page 3: ...G 9 7 2 INSPECTION AND PARTS THAT NEED TO BE MAINTAINED 10 7 3 ADDITIONAL MAINTENANCE 10 8 IMPORTANT SAFETY INFORMATION 10 9 PELLET QUALITY IS VERY IMPORTANT 10 9 1 PELLET STORAGE 11 10 BOILER CONTROL...

Page 4: ...tandards or notes contained in this User Guide accidents and or damage that occurred due to improper or incorrect use by the user accidents and or damage due to modification or maintenance without aut...

Page 5: ...the existing devices If the existence of the above indicated is established the installation can begin Follow with due attention the manufacturer s instructions the current safety norms and standards...

Page 6: ...riers for the regulation of the flow of flue gases The connector of the 80 mm flue pipe from the pellet boiler to the chimney should have the following characteristics total length of up to 5 m in the...

Page 7: ...oregoing requirements Section 3 1 Figure 3 An uptake should be grounded in accordance with the applicable regulations Grounding is legally defined and regulated Grounding should be independent of the...

Page 8: ...ed led back to flue gas pipes or should enter the chimney of a greater diameter 110 120 mm Care should be taken not to use bends of a sharp angle of 90 They must be of a certain radius or made in segm...

Page 9: ...an electrical cable for medium temperature If the power cord is damaged it must be replaced so contact our authorized service Before starting work on the electrical connection care should be taken abo...

Page 10: ...boiler are 1 Non return valves should also be 1 or larger If the non return valve is not installed the guarantee will not apply Diagram for installation of non return valve 1 Boiler Grande 2 Circular...

Page 11: ...boiler is a combustion device During operation some parts may heat up to very high temperatures The pellet boiler is a class C1 designed to burn wood pellets pellets with a 6 mm diameter maximum 30 m...

Page 12: ...or a cleaning procedure follow the following safety rules Turn the pellet boiler off before beginning any procedure Make sure that the boiler is cold before beginning any procedure on the boiler Vacu...

Page 13: ...procedure professionally you should contact the chimney sweep ADDITIONAL MAINTENANCE Your pellet boiler is a source of heat in which only pellet may be used Annual maintenance of the boiler can only b...

Page 14: ...on of the boiler due to the use of low quality pellets Pellets should be in accordance with the DIN Standard 51731 DIN plus Norm 7135 or other comparable European standards PELLETS SHOULD NOT BE KEPT...

Page 15: ...n Block Mode press and hold the key for 3 s and longer after the acoustic sound P4 P6 Change values Change values and settings in menus and submenus Browse menus and sub menus Browse menus and submenu...

Page 16: ...over Ignition Block Off Errors Alarms If error alarm occurs system switches to Block Mode Error Code Alarm Code Error Alarm Description Er01 Safety Thermostat Activated Er02 Safety Manometer Activated...

Page 17: ...s if the system is in Standby Mode due to pressed P5 key Visualizations By pressing keys P4 and P6 you enter the Visualization Menu In this menu some values of system parameters can be seen L3 On P1 P...

Page 18: ...ters Chrono The menu for the Chrono program modalities and ignition extinguishing times Manual Load The menu for the manual auger loading Possible only if the system is in OFF state Time and Date The...

Page 19: ...step the value is increased or decreased by 5 Example Calibration value 3 3 5 15 This means that the calibration value of the auger speed will be decreased by 15 in relation to default value Default...

Page 20: ...ty By opening the Chrono Menu two sub menus are visible Modality and Programming By pressing P4 and P6 keys choose one of sub menus and open it by pressing P3 key The Modality Menu contains the follow...

Page 21: ...for each day Weekly Program programming system start up shut down time for the whole week There are three time intervals available Week End Program select between two periods Monday Friday and Saturda...

Page 22: ...to start up the boiler Following ignition phases are Check Up Phase During Check Up Phase initial test of correctness on boiler input signal probes and manometers is performed During this phase flue...

Page 23: ...ditions is achieved 1 When the boiler reaches the set water temperature it switches to modulation and continues to increase temperature of water by inertia to the value of 4 C higher than the set wate...

Page 24: ...longer than 3 seconds Insufficient heat transfer Contact service Obstruction of flue gas pipes Check soiling of flue gas pipes and chimney Faulty flue gas probe Er07 Encoder error Encoder signal missi...

Page 25: ...ey longer than 3 seconds Check and clean primary air inflow pipes Check soiling and draft of flue gas pipes and chimney Obstruction of flue gas pipes Inadequately closed door during the ignition phase...

Page 26: ...power consumption during operation of the boiler W 53 Minimum power consumption during operation of the boiler W 37 Largest electricity consumption when starting the boiler W 310 Electrical consumpti...

Page 27: ...24 13 DIMENSIONS OF BOILER GRANDE 37 Figure 15...

Page 28: ...RKS 1 Pellet boiler Grande 37 2 Automatic air vent 3 Safety valve 4 Hydraulic separator 5 Circulator pump 6 Expansion vessel 7 Circulator pump 8 Non return valve 9 Three way valve with pipe thermostat...

Reviews: