background image

InisBofin Insert Roomheater 

 

 

 

 

 
 
 

InisBofin 

Roomheating 

Insert Stove 

User and Installation 

Manual 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 
 
 

 
 

EN 

The instruction satisfies relevant local, national and European standards  

Summary of Contents for InisBofin

Page 1: ...InisBofin Insert Roomheater InisBofin Roomheating Insert Stove User and Installation Manual EN The instruction satisfies relevant local national and European standards ...

Page 2: ...t properly The insert InisBofin Roomheater conforms to LST EN 13229 standard requirements Insert InisBofin Roomheater conforms to environment economic and manufacturing requirements NOTICE Before installation and operation of the Insert Bofin Room heater please read this manual This will help you to properly install and the most effectively use the product purchased and to avoid accidents When buy...

Page 3: ... Lighting the stove 8 Firing Refueling 8 Slow Burning 8 Ash Clearance 9 Stove cleaning maintenance 9 Troubleshooting 11 Stove Dimensions 13 Installation Instructions Health Safety notices 14 Stove Preparation 15 Chimney 15 Hearth Fire Surrounds 16 Stove Fitting 18 Air requirements 20 Pre check First Firing and commissioning 21 Package contents 21 Exploded view and parts list 22 ...

Page 4: ... gone out CO and Fire alarm Inis Stoves highly recommend the fitting of fully certified CO and fire alarms and regularly check that the alarms are operational for the proper protection for you your family and your home Ensure that the installer of this stove is fully qualified Fume emissions into the room must not be tolerated If this happens close the door of the stove open up some windows close ...

Page 5: ... operate the riddling mechanism insert the tool into the rectangular slot as shown When the hand tool faces downward at 45 degrees the riddling grate is in the closed position This position is used when burning wood logs When the hand tool is raised fully up at 45 degrees the grate is in the open position while burning wood logs To riddle the grate use the riddling hand tool and gently oscillate t...

Page 6: ... this is not covered by your warranty When the stove is used for the first number of times the process of curing the paint will occur To do this a small fire using only kindling wood logs should be started for approximately 30 minutes allow the stove to cool slightly then repeat the small fire using only kindling wood logs for another 20 minutes The final action to cure the paint is to put on a no...

Page 7: ...sing wood logs as fuel goes a long way in reducing your homes heating carbon footprint and also reduces our dependence on imported energy We recommend using nationally sourced wood logs in our stoves 8 To refuel the fire open the door and place the fuel in the firebox Avoid putting too much wood logs in the stove at the same time as this can result in over firing of the stove 9 Never burn househol...

Page 8: ...ty five minutes as the stove will take this time to fully heat up Under normal conditions the damper will be moved to about 8mm along the slider for optimum operation Firing Refuelling Do not let the fire burn down too low before refueling as the new fuel will smoke excessively and will require a long time to become fully alight Open the damper fully every time you refuel the stove for at least fi...

Page 9: ... start a fire if it comes into contact with combustible material like plastic bins etc Stove cleaning and maintenance Regular cleaning is essential for safe and efficient operation of the stove During the heating season it is recommended to clean the stove weekly or fortnightly Inspect on a regular basis the condition of the door seal and if found to be worn replace it immediately Only clean the s...

Page 10: ...e ash Fig 5 thoroughly Re assembly is the reverse of dis assembly 4 Check that the riddler mechanism operates free and clear Inis Stoves highly recommends annual servicing of the stove as the service engineer will ensure correct and thorough cleaning of the entire stove Inspect all internal parts of the stove and replace if needed Only Inis Stoves or an approved Engineer on our behalf should modif...

Page 11: ...nt to the room of the stove is clear Trouble shooting NOTE Excess fume emission to the room must not be tolerated Fire burns very rapidly and refueling periods are not being met 1 Chimney draught is very high chimney damper may be required 2 Fuel load too small for damper setting 3 Door seals are worn 4 Adjust the damper to a lower setting for proper fire control Fire will not burn properly 1 Chim...

Page 12: ...el will often lead to excessive glass blackening Often clean glass operation will be attained with a little experience of operation Chimney fire If the stove and chimney are kept clean no fire should occur If however it does happen close the stove damper fully close the stove door tightly Only once the fire in the stove and chimney has gone out should the stove be opened and the stove and chimney ...

Page 13: ...dure Firstly contact the installer and discuss the issue with them If further help is needed please contact the retailer We take pride in choosing retailers who have a proven track record in customer service If we still have an issue that hasn t been resolved please contact Inis Stoves technical department Please have this manual with you when you call ...

Page 14: ...der no circumstances should there be an extracting fan in the same room as the stove to avoid the possibility of combustion gases being drawn into the room This stove is not suitable for a shared flue arrangement Name Units Inis Bofin Fuel used wood logs Max measurements of wood logs mm Ø90 x 330 Efficiency at nominal heat output 69 Nominal heat output kW 5 CO concentration at 13 O 0 2 Flue spigot...

Page 15: ...ve the stove door and facade and baffle assembly should be removed The door is removed by opening the door and lifting up approx 20mm until the hinges are clear and lift away Take great care not to drop the door as it is quite heavy and the door glass can easily be broken The facade is removed See Fig 6 by removing the indicated split pin with the use of a pliers gently but firmly lift the facade ...

Page 16: ...e thoroughly cleaned and inspected Two to three weeks after the stove has been in use have the chimney cleaned again as soot previously secure may come loose as the flue gas from the stove is quite different than that from an open fire Hearth and Fire Surround If the installer has any doubts as to the positioning of the stove and necessary fire proofing expert advice should be sought before any wo...

Page 17: ...in Insert Roomheater for class 1 appliances As can be seen below in Fig 7 the minimum sizes of the opening are shown with minimum hearth thickness Fig 8 shows the minimum distances to combustibles Fig 7 Fig 8 ...

Page 18: ... any condensate or rain will flow into the flue and not down around the stove body The extension piece of flue is now pushed fully up onto the closure adaptor to allow for the stove to be positioned into the proper position Please note that the extension pipe must fit OVER the bottom end of the closure adaptor pipe The stove facade should be offered up to the stove at this point to ensure proper d...

Page 19: ...m of the straight pipe section and bolt the flue collar into place with the two bolts provided Check that the joints are all fully sealed with fire cement and haven t been damaged during fitting in place Finish the installation of the flexible liner at the top of the chimney as per the manufacturer s instructions Finally fit the facade onto the stove ensuring that the damper mechanism is free and ...

Page 20: ...located at a position in the room that will result in an air current traversing through normally occupied areas of the room Care must also be taken to ensure that the vent cannot be blocked by object left against the wall outside or debris like leaf litter etc A larger vent is required if there is an appliance like an extractor fan or tumble drier in an adjoining room To ascertain if more venting ...

Page 21: ...he damper operates properly First Firing Commissioning A small fire can now be started in the stove Use only small pieces of kindling leaving the door ajar taking care that the smoke is being drawn up through the stove and out the chimney Maintain the small fire for at least a half hour to properly set the sealing materials without cracking them from excess heat If everything is correct instruct t...

Page 22: ...r lower linkage 5 2 Door hinge Door side 17 1 Firebox rear plate 29 1 Damper plate 6 2 Door hinge Stove side 18 2 Vermiculite side sections 30 1 Damper upper linkage 7 1 Door latch spacer 19 1 Vermiculite rear section 31 4 Linkage split pins 8 1 Door latch 20 1 Baffle 32 1 Firebox body 9 1 Door latch pin 21 1 Vermiculite rear lower section 33 1 Door seal kit Not shown 10 1 Hand tool 22 1 Baffle cl...

Reviews: