3
Preparation for Installation
Before proceeding to your opener installation, check if your gate structure is in accordance with the current
standards, especially as follows:
The gate sliding track is linear and horizontal. The wheels are suitable for use. The gate should be mounted
and moved freely. Check that the structure is sufficiently strong and rigid, and that its dimensions and
weights conform to those listed in the specifications table of this document. Make sure that the gate is plumb
and level. The fence posts must be mounted in concrete. The gate does not bind or drag on the ground.
• The gate manual operation can be carried out smoothly along its entire run, and there is no excessive side
slipping.
• The opening and closing gate stops are positioned.
WARNING:
Remember that control devices are intended to facilitate gate operation, but can not
solve problems due to any defects or deficiency resulting from failure to carry out correct installation or
maintenance. Take the product out of its packing and inspect it for damage. Should it be damaged, contact
your dealer. Remember to dispose of its components (cardboard, polystyrene, nylon, etc.) according to the
current prescriptions.
Refer to the following Figures for gate installation.
In sake of safety, a positive stop must be mounted on the two end of ground track.
Summary of Contents for AC 1500
Page 1: ...REV 13E www WholesaleGateOpener com...
Page 5: ...4 Parts List...