7

if necessary to protect the system from flooding, heavy snow etc. 

2.

  Prepare  one  or  more  conduits  for  the  electrical  cables  before  pour  concrete.  Remember  that  cable 

conduits have to pass through the hole in the base plate.

3. 

Pour concrete and before it starts to harden, check that it is parallel to the gate leaf and perfectly level.

4.

 The four anchor bolts must be set into the concrete when it is poured, make sure the position of anchor 

bolts  was  placed according  to  the  position  of  mounting holes  on  the  base  plate  before  concrete  become 

harden.

5. 

Mount  the  base  plate  to  the  concrete  Pad.  It's  only  temporary  installation.  Further  adjustment  will  be 

required when install the chain.

6. 

Mount the chain box to the base plate by using screws and washers, don’

t make the four screws too tight.

Manual Operation 

The opener should be put in the manual (emergency release) position before fitting the rack, installing the 

opener and limit switch. The process is as follows:

1) Take off the rubber stopple.

2) Insert the Release Key

provided

and turn it in counter-clockwise 180° to disengage the clutch between 

the gear shaft and power output. Now the opener is in the manual operation.

             

Installation of chain and chain brackets

1. Chain Brackets

1).  Please  refer  to  below  chain  brackets  figure, 

which shows “U” bolt,    “L” bracket and chain bolt.

Use the “U” bolts (square or round)  to  attach  the 

chain brackets to gate frame.

2). If Both the square bolts and round bolts are not 

fit for the gate frame, use the appropriate bolts to 

attach the chain brackets to gate frame.

2. How to install the chain

1).  Place  the  chain  around  the  top  of  the  idler 

wheels and under the drive sprocket in chain box.

2). Connect a chain bolt to one end of chain from 

chain  box  by  using  master  link.  Then  insert  the  chain  bolt  to  the  L  bracket  and  fix  them  each  other  by 

Summary of Contents for AC 1500

Page 1: ...REV 13E www WholesaleGateOpener com...

Page 2: ...lation of the Opener 6 Manual Operation 7 Installation of chain and chain brackets 7 Installation of Magnets for Limit Switches 9 Connecting Of Power Supply 10 Connecting of the Control Board 10 Setti...

Page 3: ...before carrying out any work on the installation Also disconnect any buffer batteries if fitted Fit an omnipolar or magnetothermal switch on the mains power supply having a contact opening distance eq...

Page 4: ...es not bind or drag on the ground The gate manual operation can be carried out smoothly along its entire run and there is no excessive side slipping The opening and closing gate stops are positioned W...

Page 5: ...4 Parts List...

Page 6: ...eed 15 cm second Max gate weight 600KGS 1500LBS 1000KGS 2400LBS Max torque 12Nm 24Nm Environmental conditions From 15 C to 40 C Protection class IP44 Dimensions 25 2 22 25 CM Features Midway mode Quic...

Page 7: ...e movement of the gate and there is no danger of derailment Ensure that the safety side panels are present Necessary Tools The following tools may be necessary to install the Gate opener You will need...

Page 8: ...The opener should be put in the manual emergency release position before fitting the rack installing the opener and limit switch The process is as follows 1 Take off the rubber stopple 2 Insert the R...

Page 9: ...x the base plate by tightening the washers and nuts 7 Insert the opener shaft into the drive sprocket of chain box Mount the opener by tightening the bolts and washers 8 Fix the chain box by tightenin...

Page 10: ...fully open by hand Locate and install the magnet bracket so that the opener will stop at the desired open position when the open limit switch approaches it The magnet component with N pole outside mu...

Page 11: ...ect the live wire and neutral wire to the L 2 and N 1 terminal respectively and connect the earth wire to PE Connecting Of the Control Board 1 Motor The BLACK wire of the motor should be connected int...

Page 12: ...inal the NC terminal to the 12 terminal 5 Wired Keypad 24VDC The RED wire of the wired keypad should be connected into the 13 terminal The BLACK wire of the wired keypad should be connected into the 1...

Page 13: ...en 2 Potentiometers Potentiometer A and B are used to adjust the stall force and auto close time of the gate operator separately Turn potentiometer A clockwise to increase the stall force and turn it...

Page 14: ...obstruction or resistance such as strong wind or heavy snow sometimes Note 2 Always check the gate reversing function every each time of control board set or restart after power off How to learn or e...

Page 15: ...corrected Symptom Possible Solution s The remote control does not emit any single Check the batteries are exhausted replace them if necessary The operator doesn t run 1 Make sure that the power cord i...

Page 16: ...www WholesaleGateOpener com 7106 S 220th St Kent WA 98032 USA sales WholesaleGateOpener com 2012 2014 ALEKO All Rights Reserved...

Reviews: