1 — Overview
1-12
Alcatel-Lucent OmniAccess 8550 WSG Installation Guide, Release 2.0
September 2007
3HE03334AAAATQZZA Edition 02
Figure 1-9 Cable management arm
1.4
Installation tasks
Table
1-1
lists the tasks and procedures required to install the
8550 WSG.
Table 1-1 Installation task list
19281
Warning —
Ensure you know the site requirements and safety
precautions described in chapter
2
and the mandatory requirements
chapter before performing any installation task.
Task
Description
See
Procedure
Unpack the 8550 WSG
Unpack the 8550 WSG and verify that all the parts
are available.
3-1
Record the serial number
of the 8550 WSG
Find and record the serial number of the 8550 WSG.
3-2
Ready the rack for
installation
Assemble the rails and install them in the rack.
3-3
(1 of 2)