![Alcad AT30 SERIES Operating And Service Instructions Download Page 4](http://html1.mh-extra.com/html/alcad/at30-series/at30-series_operating-and-service-instructions_2890044004.webp)
TABLE OF CONTENTS
ii
QUICK OPERATION .................................................................................................. Back Cover
HOW TO READ THE AT30 MODEL NUMBER ............................................. Inside Front Cover
IMPORTANT SAFETY INSTRUCTIONS ......................................................................................i
1
Receiving and Installing the AT30 Battery Charger
1.1
Storing the AT30 ....................................................................................................2
1.2
Reporting shipping damage ...................................................................................2
1.3
Unpacking and inspecting the AT30 ......................................................................2
Inspection checklist
................................................................................................2
1.4
Moving the AT30 ....................................................................................................3
Enclosure type and weight table
............................................................................3
1.5
Mounting the AT30 .................................................................................................4
1.5.1 Floor-Mounting the AT30 (standard)................................................................4
1.5.2 Wall-Mounting the AT30 (optional) ..................................................................6
1.5.3 Rack-Mounting the AT30 (optional) .................................................................8
1.6
Changing the transformer taps.............................................................................10
1.7
Making the ac input connections ..........................................................................12
1.8
Making the dc output connections........................................................................14
1.9
Wiring the AT30 for remote sensing.....................................................................16
1.10 Wiring to the remote alarm contacts ....................................................................18
Auxiliary Relay Board
(optional) ...........................................................................19
1.11 Installing the temperature compensation probe (optional) ...................................20
Using temperature compensation
........................................................................22
1.12 Installing the AT30 for remote communications (optional) ...................................23
1.13 Installing the AT30 for forced load sharing (optional) ..........................................23
2
Operating the AT30 Battery Charger
2.1
Starting the AT30
2.1.1 Understanding the start-up sequence............................................................24
2.1.2 Checking the installation ................................................................................24
2.1.3 Starting the AT30 ...........................................................................................24
Using the digital meter
...................................................................................24
Factory settings table
.....................................................................................25
2.2
Using the AT30 front panel features
2.2.1 If the meter displays an error message .........................................................26
2.2.2 Selecting the meter mode..............................................................................26
2.2.3 Selecting the Float or Equalize mode ............................................................27
2.2.4 Choosing the Equalize method......................................................................27
Manual Timer method
....................................................................................27
Manual Equalize method
...............................................................................28
Auto-Equalize Timer method
.........................................................................28
2.2.5 Testing the front panel indicators...................................................................29
2.2.6 Testing the Auxiliary Relay Board (optional) .................................................29
2.2.7 Interpreting the alarm indicators ....................................................................29
Summary of Contents for AT30 SERIES
Page 99: ......