Albalá Ingenieros | Manual
SMC2000C01
4. OPERATION
This section describes the significance of the front panel indicators of the SMC2000C01
module and their remote control and monitoring ability.
4.1. Front panel description
The appearance of the front panel and the elements it contains are shown in the
following illustration.
Front panel of the SMC2000C01
Each of the two electrical ports has an associated green LED that lights up when the link
operates at 1Gbit/s, stays off for other datarates and a yellow LED that both lights up to
indicate that the link has been established and blinks when there is activity. The optical
port has a single associated yellow LED that lights up when the link has been
established.
17
Summary of Contents for SMC2000C01
Page 2: ...SMC2000C01 ...
Page 4: ...SMC2000C01 ...
Page 6: ...SMC2000C01 ...
Page 8: ...Albalá Ingenieros Manual SMC2000C01 1 3 Block diagram 8 ...
Page 10: ...Albalá Ingenieros Manual SMC2000C01 SMC2000C01 10 ...
Page 16: ...Albalá Ingenieros Manual SMC2000C01 SMC2000C01 16 ...
Page 22: ...Albalá Ingenieros Manual SMC2000C01 SMC2000C01 22 ...
Page 24: ...Albalá Ingenieros Manual SMC2000C01 SMC2000C01 24 ...
Page 26: ...Albalá Ingenieros Manual SMC2000C01 SMC2000C01 26 ...