In burner connection process there
must not be any empty space left
between the front door and the burner
barell. All connection points must be
covered with isolation material for
avoiding any air leakage possibility.
The isolation of the burner door is made
of a special thermal ceramic which is
durable up to 1250ºC and has no
defections on human health (1). Please
be sure that this isolation plate is
carried carefully and intensivly during
transportation.
There is a ceramic rope fit in to the
channels of isolation door. This prevents
leakages between isolation door and
front section of the boiler. After repairing
or cleaning service the doors
connection with the front section must
be done properly, strictly.
ADK 200 boilers doors are available for
opening to both sides. This brings
advantages of assembling, reparing and
other operations.
A tempered ceramic glass is placed on
to the burner door for watching flame
inside (2).
BURNER DOOR and BURNER CONNECTION
34
Summary of Contents for ADK 200
Page 1: ...Operation Manual ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL...
Page 2: ...Kitap Revizyon Tarihi 310706 Kitap Bask Tarihi 310706 Kitap Revizyon No 1...
Page 3: ...ADK 200 HEATING SYSTEM CAST IRON BOILERS WITH LIQUID GAS FUEL Operation Manual...
Page 4: ......
Page 6: ......
Page 12: ...10 ADK 200 CAST IRON BOILER TECNICAL DATA...
Page 13: ...11 ADK 200 CAST IRON BOILER DIMENSIONS...
Page 18: ...16 INSTRUCTIONS ABOUT FLUE...
Page 20: ...18 BOILER CONTROL PANELS...
Page 21: ...19 ELECTRICAL DIAGRAMS...
Page 27: ...25 DIAGRAMS GASSIDERESISTANCE EXITFLUEGASRESISTANCE...