![Alamo Industrial Axtreme 2 Operator'S Manual Download Page 98](http://html1.mh-extra.com/html/alamo-industrial/axtreme-2/axtreme-2_operators-manual_2888367098.webp)
OPERATION
AXTREME 2 02/10
Operation Section 3-12
© 2010 Alamo Group
OPERA
T
ION
BOOM ARM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly
installed.
•
Check condition of teflon bushings at boom
pivot points.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
OPS-B- 0022_D
Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.
(SG-20)
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses, cylin-
ders and fittings.
IMPORTANT
: DO NOT use
your hands to check for oil leaks. Use a piece
of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of nylon bushings.
OPS-B- 0023_D
Hydraulic Hoses
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.
(SG-15)
Summary of Contents for Axtreme 2
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...Introduction Section 2 1 2010 Alamo Group INTRODUCTION SECTION...
Page 87: ...Operation Section 3 1 2010 Alamo Group OPERATION SECTION...
Page 140: ......
Page 141: ...Maintenance Section 4 1 2010 Alamo Group MAINTENANCE SECTION...
Page 143: ...MAINTENANCE AXTREME 2 02 10 Maintenance Section 4 3 2010 Alamo Group MAINTENANCE...
Page 155: ......
Page 158: ...AXTREME 2 SOM 2 10 Printed in USA P N 02988075C...