![Alamo Industrial Axtreme 2 Operator'S Manual Download Page 95](http://html1.mh-extra.com/html/alamo-industrial/axtreme-2/axtreme-2_operators-manual_2888367095.webp)
OPERATION
AXTREME 2 02/10
Operation Section 3-9
© 2010 Alamo Group
OPERA
TION
6.PRE-OPERATION INSPECTION AND SERVICE
Before each use, a pre-operation inspection and service of the implement and tractor must be performed.
This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped
and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection
reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing
parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time
and repair cost can be avoided.
OPS-U-0029
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
(SG-21)
All Safety Shields, Guards and Safety devices including (but not
limited to) - the Deflectors, Chain Guards, Steel Guards, Gearbox
Shields, PTO integral shields, and Retractable Door Shields should
be used and maintained in good working condition. All safety
devices should be inspected carefully at least daily for missing or
broken components. Missing, broken, or worn items must be
replaced at once to reduce the possibility of injury or death from
thrown objects, entanglement, or blade contact.
(SGM-3)
Summary of Contents for Axtreme 2
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...Introduction Section 2 1 2010 Alamo Group INTRODUCTION SECTION...
Page 87: ...Operation Section 3 1 2010 Alamo Group OPERATION SECTION...
Page 140: ......
Page 141: ...Maintenance Section 4 1 2010 Alamo Group MAINTENANCE SECTION...
Page 143: ...MAINTENANCE AXTREME 2 02 10 Maintenance Section 4 3 2010 Alamo Group MAINTENANCE...
Page 155: ......
Page 158: ...AXTREME 2 SOM 2 10 Printed in USA P N 02988075C...