![Alamo Industrial Axtreme 2 Operator'S Manual Download Page 120](http://html1.mh-extra.com/html/alamo-industrial/axtreme-2/axtreme-2_operators-manual_2888367120.webp)
OPERATION
AXTREME 2 02/10
Operation Section 3-34
© 2010 Alamo Group
OPERA
T
ION
OPTIONAL
8.8 Head Swivel
The two upper buttons (Red Buttons) on the panel at the top of the joystick actuates the head swivel on the
attached head.
Pressing the left button swivels the head to the left.
Pressing the right button swivels the head to the right.
OPS-B- 0036_A
Make certain that the Boom swing path is clear of bystanders, powerlines, and obstructions
to prevent injury, electrocution, and possible machine damage. Swing Boom SLOWLY
AND CAREFULLY. Avoid sudden starting and stopping. (Ops-0002-MISC)
9.DRIVING THE TRACTOR AND IMPLEMENT
Safe tractor transport requires the operator to possess a thorough knowledge of the model being operated
and precautions to take while driving with an attached implement. Ensure the tractor has the capacity to
handle the weight of the boom and the tractor operating controls are set for safe transport. To ensure safety
while driving the tractor with a boom, review the following.
Read all safety instructions. Decals on the Boom warn you of particular and multiple hazards. Some decals
are attached close to part of the Boom where there is a possible hazard. Read and make sure you
understand the safety messages before you operate the implement. Keep all decals clean and readable.
Replace lost or damaged decals, refer to safety section for more information.
OPS-B- 0005_TK
Summary of Contents for Axtreme 2
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...Introduction Section 2 1 2010 Alamo Group INTRODUCTION SECTION...
Page 87: ...Operation Section 3 1 2010 Alamo Group OPERATION SECTION...
Page 140: ......
Page 141: ...Maintenance Section 4 1 2010 Alamo Group MAINTENANCE SECTION...
Page 143: ...MAINTENANCE AXTREME 2 02 10 Maintenance Section 4 3 2010 Alamo Group MAINTENANCE...
Page 155: ......
Page 158: ...AXTREME 2 SOM 2 10 Printed in USA P N 02988075C...