![Alamo Industrial Axtreme 2 Operator'S Manual Download Page 108](http://html1.mh-extra.com/html/alamo-industrial/axtreme-2/axtreme-2_operators-manual_2888367108.webp)
OPERATION
AXTREME 2 02/10
Operation Section 3-22
© 2010 Alamo Group
OPERA
T
ION
For safe and efficient boom mower operation, it is critical that the operator be experienced and feel confident in
using the control valve sticks to position the boom. New operator’s should allow ample time to practice using
the control valve sticks in an open area before entering the work site. Before attempting to operate this
equipment, read these instructions completely. If you have any questions concerning safety of operation,
contact your dealer or
Alamo Industrial
.
This valve is located on the Hydraulic Tank of the tractor unit. These are fastened together in a bank of five
valves. Their use will be explained in the following pages of this manual. Read each explanation carefully then
practice in a safe, level area, CLEAR of all people, animals, and any obstructions. As always, use extreme
caution when using this machine. This valve is controlled by operating the Remote Control Valve Box mounted
to the right of the operator at a convenient height.
NOTE
: The stamped metal plate located above the control valve indicates each valve function.
Practice performing multiple functions simultaneously. With some practice, the control valve sticks will become
very easy to operate and will feel almost as it were an extension of your arm.
With the exception of the relief valves, which are preset at the factory, these are all the controls for operating
the machine other than the controls on the tractor itself
.
VALVE OPERATION PLATE P/N 02983408
Summary of Contents for Axtreme 2
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...Introduction Section 2 1 2010 Alamo Group INTRODUCTION SECTION...
Page 87: ...Operation Section 3 1 2010 Alamo Group OPERATION SECTION...
Page 140: ......
Page 141: ...Maintenance Section 4 1 2010 Alamo Group MAINTENANCE SECTION...
Page 143: ...MAINTENANCE AXTREME 2 02 10 Maintenance Section 4 3 2010 Alamo Group MAINTENANCE...
Page 155: ......
Page 158: ...AXTREME 2 SOM 2 10 Printed in USA P N 02988075C...