12-1
TUBING CONNECTIONS
SM FBFRPM 1-A.0 GB
12. TUBING
CONNECTIONS
TUBE (Inch)
TORQUE (Nm)
¼”
⅜
”
½”
⅝
”
¾”
Flare Nuts
11-13
40-45
60-65
70-75
80-85
Valve Cap
13-20
13-20
18-25
18-25
40-50
Service Port Cap
11-13
11-13
11-13
11-13
11-13
1. Valve Protection Cap-end
2. Refrigerant Valve Port (use Allen wrench to open/close)
3. Valve Protection Cap
4. Refrigerant
Valve
5. Service Port Cap
6. Flare
Nut
7. Unit Back Side
8. Copper
Tube
When the outdoor unit is installed above the indoor unit an oil trap is required every 5m along
the suction line at the lowest point of the riser. Incase the indoor unit is installed above the
outdoor, no trap is required.
Summary of Contents for YCF055
Page 45: ...8 2 WIRING DIAGRAMS SM FBFRPM 1 A 0 GB 8 3 Indoor Units YDF030 8 4 Outdoor Unit GCN 30NRCT...
Page 46: ...8 3 WIRING DIAGRAMS SM FBFRPM 1 A 0 GB 8 5 Outdoor Unit GCN 37NRC 8 6 Outdoor Unit GCN 37NRCT...
Page 47: ...8 4 WIRING DIAGRAMS SM FBFRPM 1 A 0 GB 8 7 Outdoor Unit YDF047 8 8 Outdoor Unit YCF055...
Page 50: ...10 2 REFRIGERATION DIAGRAMS SM FBFRPM 1 A 0 GB 10 1 2 FBF045 FBF060...
Page 92: ...14 4 EXPLODED VIEWS AND SPARE PARTS LISTS SM FBFRPM 1 A 0 GB 14 4 Indoor Unit FBF046 FBF060...
Page 109: ...15 3 OPTIONAL ACCESSORIES SM FBFRPM 1 A 0 GB 15 3 RCW RCW2 Wiring Connections as Shown on Kit...