background image

OPERATING INSTRUCTIONS 

 

 

Accessories and spare parts

 

 

 

Power cord (1 pcs) 

 
 
 
 

 

 

 

 

Hex key (3 pcs) 

 

 

Teflon belts (1 pcs) 

   

 

 

Knife (1 pcs)

 

 

 

Fuse (1 pcs) 

 

Film guide pins (2 pcs) 

Summary of Contents for AirWave2

Page 1: ...OPERATING INSTRUCTIONS...

Page 2: ...ion 12 Preset function quick selection 14 Lock function 15 Change the knife 16 Change the Teflon belt 19 Change the transport belt 22 Film guide pins 24 Error codes 25 Options and expandability 26 Adv...

Page 3: ...t come into contact with liquids Do not operate the machine without the covers for the machine components Keep hair and loose clothing away from the film feed mechanism Place the machine only on surfa...

Page 4: ...voids and for use as an air cushion ring Type 7 3 AirWave air cushion filler 200 x 210 mm 7 9 x 8 3 in Ideal for filling large voids Type 7 4 AirWave air cushion filler 130 x 300 mm 5 1 x 11 8 in Idea...

Page 5: ...Type 8 4 AirWave wrapper 420mm 16 5 in 8 chambers 8 chambers for use as an envelope and intermediate layer Type 8 5 AirWave wrapper 420mm 16 5 in 7 wavy chambers 7 chambers for use as an envelope and...

Page 6: ...25 kg Color Standard anthracite blue individual on request AirWave2 dimensions l w h 413 316 232 mm 16 3 12 5 9 2 in extendible base 150 mm 6 in Control panel Filling pipe for air supply Sensor end o...

Page 7: ...85 90 0 0 3 0 1 8 6 180 356 235 455 250 482 65 85 90 0 0 3 0 3 8 3 XL 180 356 235 455 95 95 0 3 0 3 8 4 XL 180 356 95 0 3 8 3 XXL 180 356 100 0 3 8 4 XXL 180 356 100 0 3 ECO 15 m 0 6 mil 7 1 170 338 2...

Page 8: ...5 0 3 0 1 7 4 190 374 235 455 250 482 40 44 0 5 0 3 0 1 7 5 190 374 235 455 250 482 50 54 0 5 0 3 0 1 8 1 190 374 235 455 70 0 0 8 2 190 374 235 455 70 0 0 8 3 190 374 235 455 250 482 80 85 0 0 0 1 8...

Page 9: ...40 44 0 5 0 3 0 1 7 5 135 275 170 338 180 356 45 50 54 0 5 0 3 0 1 8 1 135 275 170 338 50 70 0 0 8 2 135 275 170 338 50 70 0 0 8 3 135 275 170 338 180 356 65 80 85 0 0 0 1 8 4 135 275 170 338 180 356...

Page 10: ...OPERATING INSTRUCTIONS 9 Accessories and spare parts Power cord 1 pcs Hex key 3 pcs Teflon belts 1 pcs Knife 1 pcs Fuse 1 pcs Film guide pins 2 pcs...

Page 11: ...ERATING INSTRUCTIONS 10 Initial operation Switch on machine Connect power to the machine and switch on the machine The start screen will appear automatically after approximately 3 seconds on the displ...

Page 12: ...e the side of air fill channel of the film The channel must be on the side closest to the machine Guide the air fill channel of the film onto the air nozzle Slide the film on the air nozzle a few more...

Page 13: ...film is loaded and all settings are correct touch to start the production of air cushions During production of air cushions display show Stop panel Touch to stop production of air cushions Adjust air...

Page 14: ...itself once target temperature is achieved Please see recommended settings for the different cushion types To change displayed unit please see advanced settings Preset film length The length of the a...

Page 15: ...transferred in start screen Factory adjusted M1 for type 7 1 PE Film 20 m M2 for type 8 3 PE Film 20 m To program or change a preset enter 4 5 6 and touch Select one program by touching M1 M2 M3 M4 o...

Page 16: ...confirm and return to start screen Touch to return to start screen without lock function A little padlock symbol show that touch display is locked If so it is only possible to feed film start or stop...

Page 17: ...nd disconnect power Always switch off the machine before opening it Disconnect power to the machine by removing the power cord completely from the machine Allow the machine to cool down You must follo...

Page 18: ...x key Remove the blade bracket Caution Even used blades are extremely sharp Step 4 Change blade Undo the little screw which fixes the blade with the provided hex key Turn around the blade one time 180...

Page 19: ...OPERATING INSTRUCTIONS 18 Step 5 Insert the knife Insert the knife into the slot at the machine and fix it with the screw Remount the upper cover and fix it with the screws with provided hex key...

Page 20: ...wer Always switch off the machine before opening it Disconnect power to the machine by removing the power cord completely from the machine Allow the machine to cool down You must follow this step It i...

Page 21: ...f the two guiding rollers to the right against the spring to release the tension for the lower Teflon belt Remove the slackened Teflon belt from the rollers Step 5 Insert new Teflon belts Place the ne...

Page 22: ...back to the left to press the transport rolls against each other Step 7 Close the machine covers Fit the covers of the Teflon belts and screw it with the prepared hex key Lower cover first and then th...

Page 23: ...the machine before opening it Disconnect power to the machine by removing the power cord completely from the machine Allow the machine to cool down You must follow this step It is for your safety Step...

Page 24: ...the slackened transport belt from the rollers Step 5 Insert new transport belt Place the new transport belt over the right transport rollers now press the left roll to the right against the spring un...

Page 25: ...Now you can reconnect the power cord and switch on the machine Film guide pins For a more effective air volume or better film guide for the film Types 8 3 8 5 use the two guiding pins Screw the pins a...

Page 26: ...e of error This information will help you to correct the error Error film Roll of film is empty or film is misthreaded Error electric Please contact our AirWave Packaging Service if this Error occurs...

Page 27: ...f a filling level sensor Optimal for overhead compartment or mobile air cushion storage Start Stop function with foot pedal For a production on demand Even if you have no free hand or if machine is in...

Page 28: ...e with Docking station Docking station For a decentralized consumption with mobile rolling container completely independent of machine position The large roll coiler For the production of endless roll...

Page 29: ...elay time sensor reaction 0 Off 0 99 sec Foil detection sensor Roll holder Roll holder Jumbo roll holder Airpipe All deactivated Resting time until machine starts cooling 20 min Off 0 99 min Imperial...

Page 30: ...belts and replace as the circumstances require 2 Check blue transport belt and replace as the circumstances require 3 Check red and white transport rolls regarding contamination and grip clean or repl...

Page 31: ...anty will not be extended The scope of the warranty does not include the following Damage resulting from improper use of AirWave2 This includes in particular damage caused by using unsuitable films or...

Page 32: ...ed support advice or do you have any questions We are here for you www floeter com en EN support FL TER Verpackungs Service GmbH Robert Bosch Stra e 17 71701 Schwieberdingen Germany phone 49 0 7150 92...