background image

 

Page 

2

 of 

5

 

 

8

 

  Forklift to move your inflatable safely 

  RCD to attach to your extension lead 

  Crash Mats 

 

This inflatable can be set up and packed away by 8 persons who have 
had proper manual handling training and use the correct equipment to 
move the inflatable. 
 
 

 

 

Set up:

 

 

 

 
 
 

 

 

 

 

 
 
 
 
 
 
 
 
 
 

 

Please be aware that: 

1.  The 2 sides (beginning and end) of the Structure are 

NOT

 

INTERCHANGEABLE

They are totally different in design, so there is 

ONLY 1 WAY 

to attach the Slide to 

the Structure. 

2.  Measure the territory where you intend to unroll the structure. Make sure to have 

a free space of at least 34m long and 16m wide (even more with the anchor ropes 
and filler pipes, fans).

 

3.  Be careful of any overhead cables, taking into consideration the height of the unit 

of 12m or more when inflated.

 

4.  If the unit is unrolled in the wrong direction, the weight of the structure makes it 

very difficult to turn the unit around. 

5.  Taking the weight of the units into consideration, please be careful when moving, 

transporting or handling the unit.  

6.  Please 

CHECK 

the 

DUTCH  LACING  BEFORE  INFLATION  AND  DURING 

INTENSIVE USE.

 

7.  You must cordon off 

the bottom structure so users won’t have access to it. 

DUTCH LACING 
STARTING AND 

ENDING POINTS

 

DUTCH LACING 
STARTING AND 

ENDING POINTS

 

Fig. 1

 

Summary of Contents for 8M Platform Slide

Page 1: ...mmends a maximum wind speed of Force 5 on the Beaufort scale of 28 38 kmph 19 24 mph Force 5 is a fresh breeze when small trees in leaf begin to sway Included with your Slide Extra equipment needed in addition what is supplied with your inflatable Suitable 240v Power Supply to operate the fan CAUTION Precautions should be taken during handling and use of the product to prevent electric shock The b...

Page 2: ...ructure Make sure to have a free space of at least 34m long and 16m wide even more with the anchor ropes and filler pipes fans 3 Be careful of any overhead cables taking into consideration the height of the unit of 12m or more when inflated 4 If the unit is unrolled in the wrong direction the weight of the structure makes it very difficult to turn the unit around 5 Taking the weight of the units i...

Page 3: ... 1 to point 2 and finish it by tying the loose rope to the cam buckle Next step is similar folding from point 2 to point 3 and finish it by tying it to the cam buckle Then follow the same steps from point 3 to point 4 and point 4 to point 1 for the lacing Starting and Ending points see fig 1 IT IS IMPERATIVE TO USE ALL THE CAMBUCKLES AT EVERY ENDING POINT of the lacing system because in the case o...

Page 4: ...the unit from the climb sheet This way at the next event you will be able to position the slide part exactly where you want the unit to end especially if you want to connect the slide with other units We advise to roll both parts of the unit to the width of the pallet that will be used for transporting that part Place the anchor ropes on the top of its corresponding part of the unit before rolling...

Page 5: ...ching the walls See the supplied additional op manual for slides Slide feet first only Supervisors must not allow users to go down head first as this can cause serious injury Supervisors must instruct users regarding the correct sliding position No jumping sit to launch supervise the platform at all times and instruct users regarding the correct sliding position One person to slide at a time per l...

Reviews: