background image

Page 

1

 of 

5

 

8M Platform Slide 

IMPORTANT 

AS OWNER/OPERATOR IT IS YOUR RESPONSIBILITY TO WRITE AND CARRY OUT 

 YOUR OWN RISK ASSESSMENT BEFORE ATTEMPTING TO USE THIS PRODUCT.

 

Site survey: 

1. Carry out a survey of the area where the Slide will be located, and check for any

overhead/underground cables. It’s important that this is carried out to avoid ground
anchors penetrating underground services, and the Slide coming into contact with
overhead cables when inflated.

2. You  should  provide  an  adequate power  supply  to  the fan,  this  should  adhere  to

your local power regulations.

3.

Check wind speed:

 The industry recommends a maximum wind speed of Force 5

on the Beaufort scale of 28 - 38 kmph (19-24 mph). Force 5 is a fresh breeze when
small trees in leaf begin to sway.

Included with your Slide:

 

Extra equipment needed in addition what is supplied with your inflatable: 

Suitable 240v Power Supply to operate the fan

CAUTION!

 

Precautions  should  be  taken  during  handling  and  use  of  the  product  to 

prevent  electric  shock.  The  blower  requires  a 

Ground  Fault  Protected  Circuit

 

(GFCI). Please read the manufacturer’s Instruction Manual before using the blower(s).

 

Extra equipment you could consider for your new inflatable: 

Ground sheet to protect the underside of your inflatable

Sandbag covers to anchor your inflatable indoors

The Structure

 

in its bag

 

The Slide 

in its bag

 

Anchor Pegs 

Land Operation 

Manual

 

Repair Kit 

Anchoring 

Straps 

4

X

 

Summary of Contents for 8M Platform Slide

Page 1: ...mmends a maximum wind speed of Force 5 on the Beaufort scale of 28 38 kmph 19 24 mph Force 5 is a fresh breeze when small trees in leaf begin to sway Included with your Slide Extra equipment needed in addition what is supplied with your inflatable Suitable 240v Power Supply to operate the fan CAUTION Precautions should be taken during handling and use of the product to prevent electric shock The b...

Page 2: ...ructure Make sure to have a free space of at least 34m long and 16m wide even more with the anchor ropes and filler pipes fans 3 Be careful of any overhead cables taking into consideration the height of the unit of 12m or more when inflated 4 If the unit is unrolled in the wrong direction the weight of the structure makes it very difficult to turn the unit around 5 Taking the weight of the units i...

Page 3: ... 1 to point 2 and finish it by tying the loose rope to the cam buckle Next step is similar folding from point 2 to point 3 and finish it by tying it to the cam buckle Then follow the same steps from point 3 to point 4 and point 4 to point 1 for the lacing Starting and Ending points see fig 1 IT IS IMPERATIVE TO USE ALL THE CAMBUCKLES AT EVERY ENDING POINT of the lacing system because in the case o...

Page 4: ...the unit from the climb sheet This way at the next event you will be able to position the slide part exactly where you want the unit to end especially if you want to connect the slide with other units We advise to roll both parts of the unit to the width of the pallet that will be used for transporting that part Place the anchor ropes on the top of its corresponding part of the unit before rolling...

Page 5: ...ching the walls See the supplied additional op manual for slides Slide feet first only Supervisors must not allow users to go down head first as this can cause serious injury Supervisors must instruct users regarding the correct sliding position No jumping sit to launch supervise the platform at all times and instruct users regarding the correct sliding position One person to slide at a time per l...

Reviews: