AirLive PoE-FSH2442 User’s Manual
4
Chapter 3: UNPACKING AND INSTALLATION
This chapter provides unpacking and installation information for the Switch.
3.1 Unpacking
Open the giftbox of the POE-FSH2442G and carefully unpacks its contents. The packing content should
contain the following items:
One 24+4-Port 10/100Mbps Ethernet Web Smart PoE Switch
One AC power cord, suitable for your area’s electrical power connections
Four rubber feet to be used for shock cushioning
Screws and two mounting brackets
CD-Rom with Web Management Utility, QIG and User’s Guide
If any item is found missing or damaged, please contact your local reseller for replacement
3.2 Installation
The site where you install the hub stack may greatly affect its performance. When installing, consider the
following pointers:
Install the Switch in a fairly cool and dry place. See
Technical Specifications
for the acceptable temperature
and humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust,
and direct exposure to sunlight.
Leave at least 10cm of space at the front and rear of the hub for ventilation.
Install the Switch on a sturdy, level surface that can support its weight, or in an EIA standard-size equipment
rack. For information on rack installation, see the next section, Rack Mounting
.
When installing the Switch on a level surface, attach the rubber feet to the bottom of each device. The rubber
feet cushion the hub and protect the hub case from scratching.
Figure 1. Attach the adhesive rubber pads to the bottom
3.3 Rack
Mounting
The switch can be mounted in an EIA standard-size, 19-inch rack, which can be placed in a wiring closet with
other equipment. Attach the mounting brackets at the switch’s front panel (one on each side), and secure
them with the provided screws.