
Ultima Compact™
Chillers
40 Ultima Compact 30-150kW Technical Manual 9690553 V1.2.0_10_2019
Installation
Lifting
● Employ lifting specialists.
● Local codes and regulations relating to the lifting of this type of equipment should be observed.
● Use the lifting eye bolts/lifting lugs provided.
● Attach lifting chains to the 4 lifting eye bolts/lifting lugs provided, each chain and eye bolt must be capable of
lifting the whole chiller.
●
Use the appropriate spreader bars/lifting slings with the holes/lugs provided.
● Lift the unit slowly and evenly.
● If the unit is dropped it should immediately be checked for damage and reported to Airedale Service.
The unit should be lifted from the base and where possible, with all packing and protection in position. If any other type of
slinging is used, due care should be taken to ensure that the slings do not crush the casework or coil.
Lifting Dimensions
(1) Dimensions in brackets refer to the optional buffer tank when fitted.
The unit should be lifted from the base and where possible, with all packing and protection in
position. If any other type of slinging is used, due care should be taken to ensure that the slings do
not crush the casework or coil.
CAUTION
D
B
A
C
E
Number of
Fans
Eye Bolt
Size
A
(mm)
B
(1)
(mm)
C
(mm)
D
(mm)
E
(mm)
UCCL 30-40
1
Lug
300
1050 (1450) 300 (300) 1900 (2200)
1310
UCCL 30-75
2
Lug
300
1450
750
2200
1310
Ins
ta
lla
tio
n