
Therm-X MVHRU HR95
Technical Manual
Page 11 of 59
Version 2.4, 25/09/2020
2.10.5.
CONTROLS SET-UP
The set-up of the controls on the Therm-X unit can
be performed by one of our experienced
commissioning teams.
We offer the following options to perform the
commissioning of your Therm-X units:
Site attendance for demonstration of controls
set-up
With this option one of our experienced engineers
will
attend to site for one day
and demonstrate how
to calibrate and set the controls for one Therm-X unit.
Site attendance for controls set-up
With this option one of our experienced engineers
will attend to site to check the installation and wiring
of every unit as well as calibrate and set up the
controls to the required project design conditions.
For additional information about our commissioning
options please contact our offices.
Please note:
Any mechanical or electrical works must be
completed before our engineers attend to site to
set-up the controls
Barkell will not perform the integration of the
units to the BMS
Demonstration of specific controls functionality
and witnessing is not included and must be
requested separately
2.11.
SERVICE SOFTWARE
The Therm-X service software allows full control of
the equipment and easy commissioning with a user-
friendly interface.
The software can also be used to easily transfer
settings between units making the commissioning of
large identical installations much swifter.
2.12.
WARRANTY
All units are provided with 36 months warranty
starting from the date of delivery.
The warranty covers replacement parts only.