49
Checking the glider does not only ensure its airworthiness, but also the right trim-setup gives
the best performance.
LINES:
The PURE2 is optimized for best performance. Lines used are very strong. But as with every
material also lines show an aging and will lose strength after certain use.
If a line shows an optical damage it has to be replaced.
ATTENTION: All lines must be replaced after 150 flight hours!
More information about servicing and inspections can be found in the document “Inspection
Information” available on the AIRDESIGN website www.ad-gliders.com
Ground-handling times must be multiplied by factor of 2 due to the greater contact with
abrasive surfaces.
Respecting nature and environment:
Finally, we would ask each pilot to take care of nature and our environment. Respect nature
and the environment at all times but most particularly at take-off and landing places.
Respect others and paraglide in harmony with nature.
Do not leave marked tracks and do not leave rubbish behind.
Do not make unnecessary noise and respect sensitive biological areas.
The materials used on a paraglider should be recycled.
Please send old AIRDESIGN gliders back to AIRDESIGN offices. We will undertake to recycle the
glider.
10.
The Final Word
The PURE2 will give you hours of fun and satisfaction in the air. We wish you lots of enjoyable
flights!
Treat your glider well and show respect for the demands and dangers of flying.
We ask all pilots to fly with care and to respect the national and international laws with regard
to our sport.
SEE YOU IN THE SKY!
Summary of Contents for PURE III
Page 2: ...1 ...
Page 4: ...3 ...
Page 26: ...25 ...
Page 28: ...27 ...
Page 36: ...35 ...
Page 51: ...50 ...
Page 52: ...51 A ANHANG ANNEX a Übersichtszeichnung Overview ...
Page 53: ...52 b Leinenplan line plan ...
Page 54: ...53 ...
Page 55: ...54 ...
Page 56: ...55 ...
Page 57: ...56 ...
Page 59: ...58 ...
Page 60: ...59 ...
Page 61: ...60 Faltleinen Plan Folding Lines Plan ...
Page 63: ...62 d Tragegurt RISER ...
Page 66: ...65 C Erklärung über Bauausführung und Leistung EBL Declaration of Design and Performance DDP ...
Page 67: ...66 ...
Page 72: ......