![AIC N 280 FS Installation And Maintenance Manual Download Page 45](http://html1.mh-extra.com/html/aic/n-280-fs/n-280-fs_installation-and-maintenance-manual_2870757045.webp)
I-45
B-070343_EN • B
P
roduct
I
nstallatIon
î
Make sure to insulate the
fl ue piping in damp rooms
to avoid condensation water
from forming and dripping.
î
Cut the pipes squarely and deburr the
edges. This will ensure correct sealing
and prevent seals from being damaged.
î
To ease the assembly of pipes, use exclu-
sively a mixture of water and soap (1%)
on the extremity of the pipe to be fi t in.
î
Metal fl ue pipes should always be fi t-
ted into the sleeve to the end stop.
i
Installing the pipes - General principles
î
Flue pipe elements or PP air
inlet elements should not be
screwed together.
î
Piping elements should not be bond-
ed together using glue (e.g. silicone) or
foam (e.g. PUR).
î
Plastic fl ue pipes should be
allowed to expand under the
eff ect of heat. Leave about
10 mm between the pipe and
the sleeve end stop.
î
The fl ue system should be fi tted with an
inspection opening.
î
Do not exceed the maximum length rec-
ommended for the product when con-
necting the fl ue pipes, or the system pow-
er might decrease.
î
For C-type appliances, the fl ue gas exhaust
system must at least comply with the cate-
gory T120 H1 W 1 from standard EN 14471
in the case of plastic piping. Metallic piping
must comply with the requirements of stand-
ard EN 1856.
î
The maximum length of duct must be calcu-
lated according to the permissible diff erence
in pressure indicated in the technical speci-
fi cations.
i
Component
Characteristics
Recommendation
Elbow
Clamped at the sleeve
Straight element
Clamped at the sleeve
î
< 25 cm
î
located before or after fi rst
elbow
Clamped with a bracket after elbow
Horizontal > 1m
(with 3° slope)
î
Clamped in pipe center for support
î
Allow free movement of pipe
Vertical > 2m
î
Clamped every 2 meters,
î
Even distribution of clamps
î
Allow free movement of pipe