![AIC N 280 FS Installation And Maintenance Manual Download Page 28](http://html1.mh-extra.com/html/aic/n-280-fs/n-280-fs_installation-and-maintenance-manual_2870757028.webp)
Fig. 11. Boiler transport and Installation
4 screws to be removed from the
bottom of the boiler (left and right
sides, front and back), to remove
the boiler from the pallet.
i
X4
I-28
B-070343_EN • B
P
roduct
I
nstallatIon
Handling the Product
î
This appliance is very heavy
and requires sufficient
workforce to move and han-
dle it, as well as an appro-
priate means of transport.
î
It is prohibited to handle the boiler us-
ing protruding components or rest the
boiler on protruding components.
î
Failure to comply with these recom-
mendations can result in damage to
the boiler or injuries to the personnel.
The boiler is delivered on a wooden pallet and is se-
cured to the pallet with four screws.
Make sure to transport the boiler on the pallet as
close to the installation location as practical.
Unpacking the Product
The boiler is protected by a wooden packaging lined
with rubber protection at the contact surfaces.
Once the appliance is in the boiler room or close to
the installation location:
1.
Unscrew the wooden packaging and careful-
ly remove all the packaging pieces.
2.
Discard packaging according to applicable
local regulations.
3.
Using an hex head size 8 wrench, remove
four screws (See
Fig. 11)
from the bottom
of the boiler and the pallet.
To prevent component damage during
storage due to moisture, bags of desic-
cant are placed inside the boiler. Make
sure to remove them before operating
the appliance.
i
Transporting the Product
Lifting from the side (boiler removed from the
pallet):
Slide the arms of the fork lift truck into the trans-
port holes, located on either sides of the appliance
(See
Fig. 11)
.