en-US | AHT Cooling Systems GmbH
Setup and installation | 7
370607_2_0718
49 / 64
NOTICE
Material and property damage in the case of faulty installation.
▪ Setup the unit in a stable position (horizontal alignment).
▪ Do not expose the unit to heat radiation at the installation site.
▪ Do not expose the unit at the installation site to the direct action of air conditioning and ventila-
tion.
▪ Do not setup the unit outdoors.
NOTICE
Material and property damage due to congestion of the warm exhaust air (heat ac-
cumulation.
▪ The exhaust air must be able to escape freely at the top and the rear of the unit.
▪ Observe the minimum distance to the rear wall. Defined by the wall spacer on the rear side of
the unit.
▪ The unit may only be operated with the wall spacer (loss of warranty).
▪ “Back-to-Back” installation is not permitted.
▪ Superstructures or suspended ceilings can be attached directly to the device’s top edge, only in
agreement, with the manufacturer.
▪ Do not place objects on the unit.
Assembly of the wall spacer
Responsibility: Operator
The wall spacer is included in the unit as an accessory kit.
– Hang the wall spacer into the 4 pre-assembled screws.
Wall spacer
Rear of the unit
Fig. 3:
Wall spacer
Mounting LED-bars
Responsibility: Operator
Insert the LED-bar straight and centered on the underside of the shelf display into the clips pro-
vided for this purpose.
The connection cable from the LED-bar must be on the right side.
Insert the LED-bar into the stop and press against the spring until it snaps into place.
LED-bar
Bottom display shelf
Clip
Spring
Stop
Fig. 4:
Mount LED-bar to display shelves