Product Guide – Specifications & Installation

Agnetix A3 1200

5. Make Plumbing Connections

Check the copper tubes for dents or damage.

Measure and cut any required additional tubing.

Slide tubing and push to connect fittings into place as shown on your plan.

Install any additional components.

Tighten brackets if needed

Small deformations of the tubes may be corrected with the gentle use of a tubing expander.

Replacement of a damaged tube is possible, but is not covered by the warranty.

7. Power Up and Commissioning

Install remaining networking, sensors and control components if not already installed.

Remove protective film from lenses.

Power up water cooling system, fixtures and networking hardware.

Using the dashboard software, sort and assign fixtures to the correct room, row and column of your facility.

If directed, adjust the user power settings as specified by your plan.

6. Inspection

Do not operate the fixtures before inspection by a qualified person or inspector as required in your jurisdiction.

Inspect the system for damage and to ensure proper installation of all components.

Perform formal inspection as required.

Pressure test as required.

4. Make Cable Connections

Follow the cable layout and installation details on your plan. The general information presented here is only intended to
familiarize you with the components.

Ensure power is off.

Install power receptacles at the junction boxes or electrical panels as specified in your plan.

Route, secure and install the power cabling, using tees, cable segments and drop taps as shown on your plan.

Spacing to other cables must be maintained to prevent overheating.

Verify all connections are tight to maintain water resistance.

Route, secure and connect the RJ-45 network cables to your fixtures and hub.

For wet location installations ensure only IP67 cables are used, or that an outer cover is installed.

Summary of Contents for A3 1200

Page 1: ...ble for Wet Locations ETL Listed PRODUCT SPECIFICATIONS Power 1200W Efficacy 2 23 µmol J A3 Standard Density 2 45 µmol J A3 DD Double Density Spectrum White 5000K 660nm Red others by request Beam Angle 120º Cooling Twin 1 2 Copper Tubes 1 3gpm tube PHYSICAL Housing Aluminum Extrusion Dimensions 36 x 4 x 5 Tube Length 40 Weight 15 Lbs Mounting Through bolts on Light Spine Bolts not included Lens In...

Page 2: ... A3 1200 DD contain different LED pattern with twice the LED count Light Spine mounting system 5 0 25 25 3 8 x 7 8 3 7 2 0 2 0 3 33 Nominal 40 Nominal 36 5 5 12 14 0 2 0 Downward USB Port 1 RJ 45 Ethernet Network Port w POE RJ 45 Ethernet Network Port w POE USB Port 2 7 8 Power Cable System Connection LED Module 2 LED Module 1 LED Module 3 RJ 45 Ethernet Network Port w POE 1 2 Copper Tubing Do Not...

Page 3: ... table to determine the acceptability of the power source Connection to a source in excess of 277V will cause immediate fixture destruction and is not covered by the warranty It is recommended and usually most cost effective to use a step up down transformer if needed and to provide 480Y 277 3P 5W service to operate the fixture at 277V where possible 6 Units per 30A cable 3 units per 15A cable Sta...

Page 4: ...lity The basic procedure is recommended to produce an appropriate plan 1 Determine your desired PPFD and lighted area for your chamber 2 Determine room dimensions and canopy dimensions 3 Calculate the required number of fixtures N PPFD Area m Fixture PPF 4 Choose the desired row and column spacing and the physical layout of your facility 5 Layout the fixtures as desired and check that they fit rea...

Page 5: ...tubes may be corrected with the gentle use of a tubing expander Do not remove the protective film from the lenses until commissioning in Step 7 If brackets are specified in your plan attach them to the fixtures while the protective supports are still in place Remove the protective end support and one fixture while a second person supports the second unit The protective end support should be replac...

Page 6: ... correct room row and column of your facility If directed adjust the user power settings as specified by your plan 6 Inspection Do not operate the fixtures before inspection by a qualified person or inspector as required in your jurisdiction Inspect the system for damage and to ensure proper installation of all components Perform formal inspection as required Pressure test as required 4 Make Cable...

Page 7: ...zes a UL2237 Multi point Interconnection Power Cable Assemblies for Industrial Machinery PVVA listed power cable system to reduce the time and expense of power wiring The system is composed of Outlets 15A and 30A to be installed by your electrical contractor Cables 15A and 30A Tees 15A and 30A Drop Tees 15A Reducers 30A to 15A At 277V up to 6 fixtures can generally be operated from one 30A cable o...

Page 8: ...INSTALLING IN WET OR DAMP LOCATIONS ENSURE THAT ALL PORTS NOT IN USE ARE CAPPED ALL CONNECTIONS ARE MADE WITH WATERPROOF CONNECTORS OR BOOTS ALL CONNECTIONS ARE PROPERLY TIGHTENED ATTENTION LE PRODUIT DOIT ÊTRE INSTALLÉ CONFORMÉMENT AU CODE D INSTALLATION APPLICABLE UNE PERSONNE FAMILIALE AVEC LA CONSTRUCTION ET L EXPLOITATION DE PRODUIT ET LES DANGERS IMPLIQUES ATTENTION INSTALLER LE PRODUIT CONF...

Reviews: