Agilent Technologies varian 320-MS LC/MS Pre-Installation Instructions Download Page 4

9300025700: Rev. A 

4

 

of 14

  

Pre-installation Instructions 

 

LC/MS with 212-LC and LC-460 

Figure 1 shows a possible layout for the LC/MS with the 212-LC pumps and the  
460-LC AutoSampler.  

 

Figure 1 Suggested Layout with 212-LC and 460-LC 

Table 1 and Table 2 provide information about the modules in Figure 1. 

 

Table 1 Bench Width with the 460-LC 

Bench 

Width

 

212-LC 460-LC 

MS 

  CPU 

Monitor and 

Keyboard 

Total

 

cm 26  30  53.5 

18.7 

51 

178 

cm 

in. 10.5  12 

21  7.5 

20 

71 

in. 

 

Table 2 Bench Load with the 460-LC 

Bench 

Load 

212-LC 460-LC  MS 

CPU 

Monitor and 

Keyboard 

Total 

kg 14.5 

without cooling 19 

with cooling 21 

61 11.5 

5.5 

without cooling 111.5 kg

with cooling 113.5 kg 

lb 32 

without cooling 42

 with cooling 46 

134 25.3 

11.5 

without cooling 245 lb

with cooling 250 lb 

 

Summary of Contents for varian 320-MS LC/MS

Page 1: ...114 kg 250 lb 320 MS with HTS PAL at least 103 kg 231 lb Bench does not vibrate Exhaust system is suitable Temperature maintained between 16 and 30 C 61 86 F Relative humidity maintained between 20 a...

Page 2: ...s can be analyzed After meeting all of these requirements contact the Customer Service office in your region to schedule the installation The LC MS operates reliably under carefully controlled environ...

Page 3: ...needed Allow additional room for maneuvering the shipping containers around corners and through doors Check the checklist box Entrance to the installation site is at least 92 cm 36 in wide CAUTION The...

Page 4: ...ut the modules in Figure 1 Table 1 Bench Width with the 460 LC Bench Width 212 LC 460 LC MS CPU Monitor and Keyboard Total cm 26 30 53 5 18 7 51 178 cm in 10 5 12 21 7 5 20 71 in Table 2 Bench Load wi...

Page 5: ...5 11 5 231 lb The system requires a clean flat bench The bench must be strong enough to support the weight of the modules The area under the bench must be large enough for the foreline pump If the be...

Page 6: ...have sufficient room to connect the MS to the foreline pump If the distance between the bench and the wall is less than 10 2 4 in then the bench must be at least 94 cm 37 in deep To accommodate the v...

Page 7: ...least 20 L min to a separate vent line Ensure that the exhaust system does not pull a vacuum on the API chamber Consult local regulations for the proper method of exhausting the fumes Check the checkl...

Page 8: ...er particulate matter Particulate matter may block airflow vents causing the electronics to overheat Check the checklist box Installation site is free of excessive particulate matter Power Requirement...

Page 9: ...instruments and equipment Never plug the mass spectrometer and the chromatograph into the same power source or the power source may overload Never use the free outlet on any of the power sources for e...

Page 10: ...ags or transients The voltage must meet EN IEC 61000 4 5 and EN IEC 61000 4 11 standards for voltage stability A measured ground to neutral potential of greater than 3V ac or V dc indicates grounding...

Page 11: ...erators require regular maintenance The customer is responsible for setting up the preventive maintenance procedures and schedules contact the nitrogen generator manufacturer The Varian Warranty does...

Page 12: ...ean and new volumetric flask for optional APCI Table 14 Solvents for ESI or APCI Quantity each Solvent 2 4 liter bottle HPLC grade or better water new and unopened 2 4 liter bottle HPLC grade or bette...

Page 13: ...ansit and instrument damage may have occurred One indicator is on the exterior Read and follow the instructions on the label If the tube on the ShockWatch indicator is red the carton was dropped in tr...

Page 14: ...e and the conditions of delivery accepted The process requires at least three days Spare Parts Please refer to the Quadrupole Hardware Manual which has list of spare parts for routine operation Preven...

Reviews: