Pre-installation Instructions 

 

Varian will not accept liability for damage if obviously received damaged materials were 
received without noting the damage on the receiving documents. 

;

 

Check the checklist box: Shipping cartons inspected for damage. If there was 

any damage, the conditions were reported.

 

Unpacking and Installing 

The Varian Representative will review the Pre-installation Checklist with the customer to ensure 
that the site requirements were met. The Varian Representative will unpack and install the 
instrument and demonstrate the fundamental operation and maintenance procedures. The User 
Representative must be present during the installation.  

The Varian Representative will demonstrate that the system meets the performance 
specifications, which are on the data sheet and any additional criteria explicitly written into the 
sales contract. 

Plan to analyze samples only after the installation is complete and the conditions of delivery 
accepted. The process requires at least three days.  

Spare Parts 

Please refer to the 

Quadrupole Hardware Manual, 

which has list of spare parts for routine 

operation. 

Preventive Maintenance 

The customer is responsible for performing routine and preventive maintenance of the LC, 
autosampler, MS, and data system. If using a nitrogen generator, perform the preventive 
maintenance to ensure that the nitrogen supply is clean and dry. Any instrument problems 
resulting from a contaminated gas supply are billable and not included in the Varian Warranty. 

Perform regular preventive maintenance to increase the life of the system, to maximize system 
uptime, and to optimize system performance. Please refer to the 

Quadrupole Hardware Manual 

for details. The Varian Representative will describe and demonstrate these procedures during 
the installation. 

Trademark Acknowledgment 

Microsoft® and Windows® are registered trademarks of Microsoft Corporation. PEEK™ is a 
registered trademark of the Victrex PLC Company, Lancashire, England. Other brand and 
product names are trademarks or registered trademarks of their respective holders.

 

 

Summary of Contents for varian 320-MS LC/MS

Page 1: ...114 kg 250 lb 320 MS with HTS PAL at least 103 kg 231 lb Bench does not vibrate Exhaust system is suitable Temperature maintained between 16 and 30 C 61 86 F Relative humidity maintained between 20 a...

Page 2: ...s can be analyzed After meeting all of these requirements contact the Customer Service office in your region to schedule the installation The LC MS operates reliably under carefully controlled environ...

Page 3: ...needed Allow additional room for maneuvering the shipping containers around corners and through doors Check the checklist box Entrance to the installation site is at least 92 cm 36 in wide CAUTION The...

Page 4: ...ut the modules in Figure 1 Table 1 Bench Width with the 460 LC Bench Width 212 LC 460 LC MS CPU Monitor and Keyboard Total cm 26 30 53 5 18 7 51 178 cm in 10 5 12 21 7 5 20 71 in Table 2 Bench Load wi...

Page 5: ...5 11 5 231 lb The system requires a clean flat bench The bench must be strong enough to support the weight of the modules The area under the bench must be large enough for the foreline pump If the be...

Page 6: ...have sufficient room to connect the MS to the foreline pump If the distance between the bench and the wall is less than 10 2 4 in then the bench must be at least 94 cm 37 in deep To accommodate the v...

Page 7: ...least 20 L min to a separate vent line Ensure that the exhaust system does not pull a vacuum on the API chamber Consult local regulations for the proper method of exhausting the fumes Check the checkl...

Page 8: ...er particulate matter Particulate matter may block airflow vents causing the electronics to overheat Check the checklist box Installation site is free of excessive particulate matter Power Requirement...

Page 9: ...instruments and equipment Never plug the mass spectrometer and the chromatograph into the same power source or the power source may overload Never use the free outlet on any of the power sources for e...

Page 10: ...ags or transients The voltage must meet EN IEC 61000 4 5 and EN IEC 61000 4 11 standards for voltage stability A measured ground to neutral potential of greater than 3V ac or V dc indicates grounding...

Page 11: ...erators require regular maintenance The customer is responsible for setting up the preventive maintenance procedures and schedules contact the nitrogen generator manufacturer The Varian Warranty does...

Page 12: ...ean and new volumetric flask for optional APCI Table 14 Solvents for ESI or APCI Quantity each Solvent 2 4 liter bottle HPLC grade or better water new and unopened 2 4 liter bottle HPLC grade or bette...

Page 13: ...ansit and instrument damage may have occurred One indicator is on the exterior Read and follow the instructions on the label If the tube on the ShockWatch indicator is red the carton was dropped in tr...

Page 14: ...e and the conditions of delivery accepted The process requires at least three days Spare Parts Please refer to the Quadrupole Hardware Manual which has list of spare parts for routine operation Preven...

Reviews: