Agilent Technologies varian 320-MS LC/MS Pre-Installation Instructions Download Page 2

9300025700: Rev. A 

2

 

of 14

  

Pre-installation Instructions 

 

Contents 

Introduction ................................................................... 2

 

Safety ...................................................................... 2

 

Before the Installation ................................................... 3

 

User Representative ................................................ 3

 

Entrance .................................................................. 3

 

Bench Space and Load ........................................... 3

 

Vibration .................................................................. 6

 

Temperature ............................................................ 7

 

Humidity ................................................................... 8

 

Particulate Matter .................................................... 8

 

Power Requirements .............................................. 8

 

Installation Site Power .......................................... 10

 

Qualified Computer Equipment ............................. 11

 

Gas Requirements ................................................ 11

 

Materials and Solvents.......................................... 12

 

When the LC/MS Arrives ............................................ 13

 

Inspecting the Shipping Cartons ........................... 13

 

Unpacking and Installing ....................................... 14

 

Spare Parts ................................................................ 14

 

Preventive Maintenance ............................................. 14

 

Introduction 

The Pre-installation Instructions are a guide for each requirement of the checklist. Follow these 
instructions to ensure that the installation requires no more than the usual three days. Have the 
completed checklist available to schedule the installation. After the Varian Representative 
completes the installation, and it is accepted, samples can be analyzed. 

After meeting all of these requirements, contact the Customer Service office in your 
region to schedule the installation. 

The LC/MS operates reliably under carefully controlled environmental conditions. You must 
provide suitable power sources, operating environment, materials, and solvents. Failures may 
occur if you use or maintain the system outside of the power and operating environment ranges 
and limits described in these instructions. The Varian Warranty and Service contract specifically 
excludes the repair of failures due to such causes. 

CAUTION

 

All phases of preparing the installation site must conform to 
local safety, electrical, and building codes. These codes take 
precedence over any recommendations in these instructions. 
The customer is responsible for compliance. 

Safety 

Safety is the most important consideration for instrument use. Determine if the installation site 
complies with all relevant safety regulations. 

;

 

Check the checklist box: Installation site is in compliance with all relevant 
safety regulations.

 

 

Summary of Contents for varian 320-MS LC/MS

Page 1: ...114 kg 250 lb 320 MS with HTS PAL at least 103 kg 231 lb Bench does not vibrate Exhaust system is suitable Temperature maintained between 16 and 30 C 61 86 F Relative humidity maintained between 20 a...

Page 2: ...s can be analyzed After meeting all of these requirements contact the Customer Service office in your region to schedule the installation The LC MS operates reliably under carefully controlled environ...

Page 3: ...needed Allow additional room for maneuvering the shipping containers around corners and through doors Check the checklist box Entrance to the installation site is at least 92 cm 36 in wide CAUTION The...

Page 4: ...ut the modules in Figure 1 Table 1 Bench Width with the 460 LC Bench Width 212 LC 460 LC MS CPU Monitor and Keyboard Total cm 26 30 53 5 18 7 51 178 cm in 10 5 12 21 7 5 20 71 in Table 2 Bench Load wi...

Page 5: ...5 11 5 231 lb The system requires a clean flat bench The bench must be strong enough to support the weight of the modules The area under the bench must be large enough for the foreline pump If the be...

Page 6: ...have sufficient room to connect the MS to the foreline pump If the distance between the bench and the wall is less than 10 2 4 in then the bench must be at least 94 cm 37 in deep To accommodate the v...

Page 7: ...least 20 L min to a separate vent line Ensure that the exhaust system does not pull a vacuum on the API chamber Consult local regulations for the proper method of exhausting the fumes Check the checkl...

Page 8: ...er particulate matter Particulate matter may block airflow vents causing the electronics to overheat Check the checklist box Installation site is free of excessive particulate matter Power Requirement...

Page 9: ...instruments and equipment Never plug the mass spectrometer and the chromatograph into the same power source or the power source may overload Never use the free outlet on any of the power sources for e...

Page 10: ...ags or transients The voltage must meet EN IEC 61000 4 5 and EN IEC 61000 4 11 standards for voltage stability A measured ground to neutral potential of greater than 3V ac or V dc indicates grounding...

Page 11: ...erators require regular maintenance The customer is responsible for setting up the preventive maintenance procedures and schedules contact the nitrogen generator manufacturer The Varian Warranty does...

Page 12: ...ean and new volumetric flask for optional APCI Table 14 Solvents for ESI or APCI Quantity each Solvent 2 4 liter bottle HPLC grade or better water new and unopened 2 4 liter bottle HPLC grade or bette...

Page 13: ...ansit and instrument damage may have occurred One indicator is on the exterior Read and follow the instructions on the label If the tube on the ShockWatch indicator is red the carton was dropped in tr...

Page 14: ...e and the conditions of delivery accepted The process requires at least three days Spare Parts Please refer to the Quadrupole Hardware Manual which has list of spare parts for routine operation Preven...