90
Chapter 12
Monitor Spectrum Measurements
Configuring the Measurement System
Configuring the Measurement System
The base station (BTS) under test have to be set to transmit the RF power remotely
through the system controller. This transmitting signal is connected to the analyzer
RF input port. Connect the equipment as shown.
Figure 12-1
Transmit Power Measurement System
1. Using the appropriate cables, adapters, and attenuator, connect the output
signal of the BTS to the RF input of the analyzer.
2. Connect a BNC cable between the frequency reference port of the BTS and the
EXT REF IN port of the analyzer.
3. Using a BNC cable, connect the trigger signal from the BTS to the TRIGGER1
IN port of the analyzer.
4. Connect the system controller to the BTS through the serial bus cable to control
the BTS operation.
Summary of Contents for N9010A
Page 4: ......
Page 7: ...Contents 7 Waveform Signal Envelope Views of I only or Q only 106...
Page 8: ...8 Contents...
Page 12: ...12 Chapter1 Making TD SCDMA with HSPA 8PSK Measurements Setting Up and Making a Measurement...
Page 25: ...Chapter 3 25 ACP Measurements Measurement Procedure Messages Guide...
Page 28: ...28 Chapter3 ACP Measurements Measurement Results...
Page 44: ...44 Chapter5 Spectrum Emission Mask Measurements Troubleshooting Hints...
Page 64: ...64 Chapter8 Power Statistics CCDF Measurements Troubleshooting Hints...
Page 94: ...94 Chapter12 Monitor Spectrum Measurements Measurement Results...