10
Installation Note N5230-90022
Step 3. Remove the 20 GHz Bottom Cables
Refer to
for this procedure.
1. Place the analyzer bottom-side up on a flat surface.
2. Remove the following cables in the order listed:
• W40 A17 MASS 26.5 to A25 port 1 step attenuator
• W42 A25 port 1 step attenuator to PORT 1 SOURCE OUT
• W44 PORT 1 CPLR THRU to A21 test port 1 coupler
• W46 A17 MASS 26.5 to REFERENCE 1 SOURCE OUT
• W51 REFERENCE 1 RCVR R1 IN to A20 mixer brick (R1)
• W48 A21 test port 1 coupler to PORT 1 CPLR ARM
• W50 PORT 1 RCVR A IN to A20 mixer brick (A)
• W41 A17 MASS 26.5 to A26 port 2 step attenuator
• W43 A26 port 2 step attenuator to PORT 2 SOURCE OUT
• W45 PORT 2 CPLR THRU to A22 test port 2 coupler
• W47 A17 MASS 26.5 to REFERENCE 2 SOURCE OUT
• W52 REFERENCE 2 RCVR R2 IN to A20 mixer brick (R2)
• W49 A22 test port 2 coupler to PORT 2 CPLR ARM
• W53 PORT 2 RCVR B IN to A20 mixer brick (B)
Figure 5
20 GHz Bottom Cables Removal
Summary of Contents for N5230AU-974
Page 13: ...Installation Note N5230 90022 13 Figure 8 20 GHz Top to Bottom Cables Removal Top...
Page 15: ...Installation Note N5230 90022 15 Figure 9 20 GHz Components Removal...
Page 17: ...Installation Note N5230 90022 17 Figure 10 50 GHz Components Installation...
Page 19: ...Installation Note N5230 90022 19 Figure 12 50 GHz Top to Bottom Cables Installation Top...
Page 23: ...Installation Note N5230 90022 23 Figure 15 50 GHz Bottom Cables Installation...