![Agilent Technologies HP 5890 II Plus Series Manual Download Page 38](http://html1.mh-extra.com/html/agilent-technologies/hp-5890-ii-plus-series/hp-5890-ii-plus-series_manual_2868131038.webp)
Installation
Connecting power line cord
37
Message indicating normal termina-
tion of diagnostic tests after power
restoration. User setpoints remain
in force.
LEDs off, except possibly NOT
READY.
HP 5890 Self-testing in progress.
LEDs off, except possibly NOT
READY.
HP 5890 memory test in progress.
Test of display elements: all alpha-
numeric and LED elements are lit.
INITIAL
TIME
RATE
OVEN
FINAL
TIME
STATUS
OVEN
STATUS
OVEN
STATUS
OVEN
STATUS
INITIAL
TIME
RATE
FINAL
TIME
INITIAL
TIME
RATE
FINAL
TIME
INITIAL
TIME
RATE
FINAL
TIME
RUN
NOT
READ
Y
RUN
NOT
READ
Y
RUN
NOT
READ
Y
RUN
NOT
READ
Y
Normal Integrity Check At Power-on
2. Review the self•diagnosticelectronic performance verification: this
requires about 30 seconds.
Successful completion is indicated when the message
PASSED SELF
TEST
is displayed.
3. When
PASSED SELF TEST
is displayed, verify that the keyboard is
active by pressing
OVEN TEMP
. The display should change
immediately to one showing current oven status.
Summary of Contents for HP 5890 II Plus Series
Page 1: ...Chemical Analysis Group 5890 Gas Chromatograph 5890 Series II Site Prep Info Document A15282 ...
Page 2: ...Site Prep Installation Manual HP 5890 Series II and HP 5890 Series II Plus ...
Page 6: ...1 Site Preparation ...
Page 19: ...This page intentionally left blank ...
Page 20: ...2 Installation ...