Installation
Connecting supply gases
31
After supply gases are connected, the system may be pressurized, and all
installed fittings then checked for leaks.
1. At the HP 5890 flow panel, do the following:
a. Close all detector on/off valves (fully
clockwise
). Do the same for
capillary makeup gas.
b.
Gently
close all mass flow controllers by turning them
clockwise
only until they
bottom
, then
no further
.
2. Perform the following at the source for each gas supply:
a. Turn on the gas supply at its source.
b. Use the following guidelines in setting supply pressures:
Note:
Suggested pressure values are defined
at the instrument
.
If supply tubing is long or narrow, or if multiple devices are
supplied from the same source, pressure at the supply itself may
not represent pressure at the HP 5890.
C
For any gas
supplied to the HP 5890 through a
local
pressure regulator (e.g., regulators on Accessory 19246A
auxiliary flow panels), set supply pressure at least 69 kPa
(10 psi) greater than the highest pressure to be set at the
local
regulator.
C
For carrier gases
, set supply pressure into the appropriate
mass flow controller to 345 kPa (50 psi) for column head
pressures up to 207 kPa (30 psi). For greater column head
pressures, set pressure into the mass flow controller to at least
138 kPa (20 psi) greater than the desired head pressure.
C
For capillary makeup gas
, set supply pressure to the
appropriate
AUX
on/off valve (detector flow manifold block) to
276 kPa (40 psi).
Summary of Contents for HP 5890 II Plus Series
Page 1: ...Chemical Analysis Group 5890 Gas Chromatograph 5890 Series II Site Prep Info Document A15282 ...
Page 2: ...Site Prep Installation Manual HP 5890 Series II and HP 5890 Series II Plus ...
Page 6: ...1 Site Preparation ...
Page 19: ...This page intentionally left blank ...
Page 20: ...2 Installation ...