Chapter 2
11
Getting Started
Meeting Electrical and Environmental Requirements
1. Ensure that the power cord is not damaged.
2. Install the signal generator so that one of the following items is readily identifiable and easily reached by
the operator: ac power cord, alternative switch, or circuit breaker.
3. Insert the mains plug into a socket outlet provided with a protective earth grounding.
Summary of Contents for E4428C ESG
Page 7: ...1 1 Safety Information ...
Page 12: ...6 Chapter 1 Safety Information General Safety Considerations ...
Page 13: ...7 2 Getting Started ...
Page 28: ...22 Chapter 2 Getting Started Contacting Agilent Sales and Service Offices ...
Page 29: ...23 3 Operation Verification ...
Page 61: ...55 4 Regulatory Information ...
Page 64: ...58 Chapter 4 Regulatory Information Regulatory Information misc ...