13
7890 Series GC Site Preparation Checklist
Issued: 09-Dec-2015, Revision: 1.8
Copyright
2013
Agilent Technologies
Page 13 of 15
GC Installation Kits
Pre-configured kits to make the GC system installation go smoother.
All kits include two Shutoff valves - one for each inlet carrier supply.
Description
Part number
Installation Kit for FID/NPD/FPD (Includes Gas Clean Filter Kit CP736538) for Moisture, O2 and
Hydrocarbon removal.
19199N
Installation Kit for TCD/ECD/MSD - no Gas Filters Included - order separately for ECD - Gas
Clean Filter is included with MSD.
19199M