
7713397 R2
85
Figure 101.
Level Auger Fill Switch Location
FRONT
OF
DRYER
REAR
OF
DRYER
INTAKE
GRAIN
AT REAR
(2 FT FROM END)
FILL SWITCH AT
OPPOSITE END OF FILLING
STANDARD AUGER MOTOR
ROTATION PULLS GRAIN
TOWARD MOTOR
FILL DRYER SWITCH ASSEMBLY:
#059167-16-30
(REPLACEMENT SWITCH: 059167RH)
Connect Fill Switch and Low Switch
1. The upper-most dryer section burner box uses the Y-split cables, one cable end marked “Fill" and the other
cable marked “Low". This cable will be in the dryer crate.
2. Cable length supplied is sufficient to reach switch locations on all dryer sizes.
3. Route the cable above the transition and along the toe board of the catwalk using sticky tabs to the middle
of the dryer.
4. Connect the cable marked “Low" to the low dryer switch.
5. Connect the cable marked “Fill" to the fill dryer switch.
CONTINUOUS-FLOW GRAIN DRYER – COMMANDER CONTROL